FY25 GAOA HORSESHOE CREEK TRAIL BRIDGE INSTALL.
SAM.GOV
Due: June 30, 2025 at 09:00 PM UTC
In-Active Solicitation SBA Source Url

Summary

The FY25 GAOA Horseshoe Creek Trail Bridge Install project involves the installation of a new trail bridge on the Custer Gallatin National Forest, specifically within the Beartooth Ranger District. The contractor will be responsible for providing specific bridge components such as sills and diaphragms, removing existing materials, and installing various structural elements including stringers and fasteners. Additionally, the project includes optional work for complete bridge installation, which encompasses decking, curbing, and approach construction. This opportunity is ideal for small businesses specializing in construction and bridge installation, particularly those with experience in government contracts and outdoor infrastructure projects.
Description

The scope of this project is to deliver the bridge items needed to install a new trail bridge, Horseshoe Creek, on the Custer Gallatin National Forest on the Beartooth Ranger District.

BASE ITEMS:  Contractor shall provide both sills and all (20) diaphragms, (See attached draw

Entities
ADO
Department of Agriculture
FS
Forest Service
NAICS
237310
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Montana 59771
Point of Contact
Full Name Email Phone Type
Paula Sales [email protected] None primary
John Curry [email protected] 6056739216 secondary
Attachments
  • 1240LU25Q0013+Attachment+3+-FSSS+Updated+03.25.2025.docx
  • 1240LU25Q0013+Attachment+4-Wage+Determination+Park+County.pdf
  • 1240LU25Q0013+RFQ+w+clauses.pdf
  • 1240LU25Q0013+Attachment+2-Schedule+of+Items+04.07.25.xlsx
  • 1240LU25Q0013+Attachment+4-Wage+Determination+Stillwater+County.pdf
  • 1240LU25Q0013+Attachment+5-Map.pdf
  • 1240LU25Q0013+Attachment+1-+SOW-04.04.25.docx
  • 1240LU25Q0013+Attachment+6-Plans.pdf
  • 1240LU25Q0013+RFQ+Amendment+0001.pdf
  • 1240LU25Q0013+RFQ+Amendment+0002.pdf
  • 1240LU25Q0013+RFQ+Amend+0003.pdf