FY25 Multiple Award Construction Contract (MACC)
SAM.GOV
Due: May 15, 2025 at 04:00 PM UTC
In-Active Solicitation SBA Source Url

Summary

The FY25 Multiple Award Construction Contract (MACC) is an Indefinite Delivery/Indefinite Quantity (IDIQ) contract aimed at supporting Fairchild Air Force Base (FAFB) and associated sites in Washington. This contract will encompass a variety of construction projects, including maintenance, repair, and minor construction tasks, with a focus on Design-Build and Construction Only services. Contractors interested in this opportunity should be small businesses capable of responding quickly to urgent needs, particularly during natural disasters or life/safety issues. The total program value is capped at $95 million over a five-year base period, with a potential two-year extension. Bidders must demonstrate the ability to meet specific performance requirements and bonding capacities, making this a significant opportunity for qualified small construction firms.
Entities
DOD
Department of Defense
DOTAF
Department of the Air Force
NAICS
236220
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Fairchild AFB , Washington 99011
Point of Contact
Full Name Email Phone Type
Richard Hedrick [email protected] 5092474867 primary
Tuyen Nguyen [email protected] 5092472072 secondary
Attachments
  • 25R0001_Atch11A_FOPR_GJKZ1149058-Atch1-PriceSchedule.pdf
  • 25R0001_SF1442-20250414.pdf
  • 25R0001_Atch7A-WA20250114-Building20250214.pdf
  • 25R0001_Amend0003-SF30-20250501.pdf
  • 25R0001_Atch10-SubKTRTeamingArrngmntRelease.pdf
  • SOWAtchC-15PcntConceptDemoPlan.pdf
  • SOWAtchF-ExistingB2256Drwgs.pdf
  • 25R0001_Atch1-FY25MACCSpecs12FEB2025.pdf
  • 25R0001_Amend0001-SF30-20250417.pdf
  • 25R0001_Amend0002-SF30-20250428.pdf
  • 25R0001_Atch11_FOPR_GJKZ1149058.pdf
  • SOWAtchF_Amend0005ExistingB2256Drwgs.pdf
  • SOWAtchD1-15PcntConceptPlan.pdf
  • SOWAtchE-BasisofDesignEqpmnt.pdf
  • 25R0001_Atch11B_FOPR_GJKZ1149058-Atch2-SOW20DEC2024.pdf
  • SOWAtchD2-15PcntConcept+Plan.pdf
  • 25R0001_Atch8-PastPerfCvrLtrQuestionnaire.pdf
  • 25R0001_Atch7C-WA20250001-Highway20250321.pdf
  • SOWAtchB-PhotosB2256_2257_2258_2259.pdf
  • 25R0001_Atch9-PastPerformanceInfo.pdf
  • 25R0001_Atch7D-WA20250095-Residential20250207.pdf
  • 25R0001_Atch7B-WA20250130-Heavy20250207.pdf
  • 25R0001_Atch12-OrientationSmnrSOW.pdf
  • 25R0001_Atch2-2025BDGSpecs11MAR2025.pdf
  • 25R0001_Atch4-2018FAFBIFS26JUN2018.pdf
  • 25R0001_Amend0004-SF30-20250508.pdf
  • 25R0001_Amend0005-SF30-20250508.pdf
  • 25R0001_Atch3-2025BDGDataSheets.pdf
  • SOWAtchA-SiteHaulRoute.pdf
  • 25R0001_Atch6-RealIDActPamphlet.pdf
  • 25R0001_Atch5-FAFBClimateWeatherData.pdf
  • 25R0001_PreProposalSiteVisitSignIn-20250428.pdf