FY25 Multiple Award Construction Contract (MACC)
SAM.GOV
Due: May 15, 2025 at 04:00 PM UTC
In-Active Solicitation SBA Source Url

Summary

The FY25 Multiple Award Construction Contract (MACC) is a solicitation for construction services at Fairchild Air Force Base, Washington, aimed at providing indefinite delivery and indefinite quantity (IDIQ) design-build construction efforts. This contract will encompass a wide range of general construction tasks, including maintenance, repair, and new construction projects, with specific focus on facility upgrades, utility work, airfield pavement, and various trades such as carpentry, electrical, plumbing, and demolition. Contractors with experience in these areas, particularly small businesses, are encouraged to bid, as this opportunity is set aside for total small business participation. The project will require contractors to respond quickly to emergencies and life/safety issues, making it essential for bidders to be located within a six-hour response time from the base.
Description

This is a solicitation for a Multiple Award Construction Contract (MACC) at Fairchild AFB, WA. This acquisition will provide indefinite delivery, indefinite quantity (IDIQ) and design-build (D-B) construction efforts at Fairchild AFB, WA. The MACC will consist of multiple disciplines in general c

Entities
DOD
Department of Defense
DOTAF
Department of the Air Force
NAICS
236220
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Fairchild AFB , Washington 99011
Point of Contact
Full Name Email Phone Type
Richard Hedrick [email protected] 5092474867 primary
Tuyen Nguyen [email protected] 5092472072 secondary
Attachments
  • 25R0001_Atch11A_FOPR_GJKZ1149058-Atch1-PriceSchedule.pdf
  • 25R0001_SF1442-20250414.pdf
  • 25R0001_Atch7A-WA20250114-Building20250214.pdf
  • 25R0001_Atch10-SubKTRTeamingArrngmntRelease.pdf
  • SOWAtchC-15PcntConceptDemoPlan.pdf
  • SOWAtchF-ExistingB2256Drwgs.pdf
  • 25R0001_Atch1-FY25MACCSpecs12FEB2025.pdf
  • 25R0001_Atch11_FOPR_GJKZ1149058.pdf
  • SOWAtchD1-15PcntConceptPlan.pdf
  • SOWAtchE-BasisofDesignEqpmnt.pdf
  • 25R0001_Atch11B_FOPR_GJKZ1149058-Atch2-SOW20DEC2024.pdf
  • SOWAtchD2-15PcntConcept+Plan.pdf
  • 25R0001_Atch8-PastPerfCvrLtrQuestionnaire.pdf
  • 25R0001_Atch7C-WA20250001-Highway20250321.pdf
  • SOWAtchB-PhotosB2256_2257_2258_2259.pdf
  • 25R0001_Atch9-PastPerformanceInfo.pdf
  • 25R0001_Atch7D-WA20250095-Residential20250207.pdf
  • 25R0001_Atch7B-WA20250130-Heavy20250207.pdf
  • 25R0001_Atch12-OrientationSmnrSOW.pdf
  • 25R0001_Atch2-2025BDGSpecs11MAR2025.pdf
  • 25R0001_Atch4-2018FAFBIFS26JUN2018.pdf
  • 25R0001_Atch3-2025BDGDataSheets.pdf
  • SOWAtchA-SiteHaulRoute.pdf
  • 25R0001_Atch6-RealIDActPamphlet.pdf
  • 25R0001_Atch5-FAFBClimateWeatherData.pdf