FY25 Multiple Award Construction Contract (MACC)
SAM.GOV
Due: May 15, 2025 at 04:00 PM UTC
In-Active Solicitation SBA Source Url

Summary

The FY25 Multiple Award Construction Contract (MACC) is a solicitation for an Indefinite Delivery, Indefinite Quantity (IDIQ) contract aimed at providing construction services at Fairchild Air Force Base, Washington. This contract will encompass a wide range of construction activities including maintenance, repair, and new construction projects, with specific tasks in various trades such as carpentry, electrical, plumbing, and demolition. Contractors interested in this opportunity should be small businesses capable of responding quickly to urgent needs, particularly during natural disasters or life/safety issues. The contract is set aside for small businesses, and the anticipated performance period includes a five-year base ordering period with an option for an additional two years. The total program value is capped at $95 million, and contractors must demonstrate the ability to meet bonding requirements and provide timely responses to project demands.
Description

UPDATE:  4/28/2025 - AMENDMENT 0002

AMENDMENT 0002 is to answer questions proposed by prospective contractors for the FY25 MACC. Correct paragraph references in Section L from Amend0001 issued on 17 April 2025, update submission address and Block 13(d) of the SF1442.

Entities
DOD
Department of Defense
DOTAF
Department of the Air Force
NAICS
236220
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Fairchild AFB , Washington 99011
Point of Contact
Full Name Email Phone Type
Richard Hedrick [email protected] 5092474867 primary
Tuyen Nguyen [email protected] 5092472072 secondary
Attachments
  • 25R0001_Atch11A_FOPR_GJKZ1149058-Atch1-PriceSchedule.pdf
  • 25R0001_SF1442-20250414.pdf
  • 25R0001_Atch7A-WA20250114-Building20250214.pdf
  • 25R0001_Atch10-SubKTRTeamingArrngmntRelease.pdf
  • SOWAtchC-15PcntConceptDemoPlan.pdf
  • SOWAtchF-ExistingB2256Drwgs.pdf
  • 25R0001_Atch1-FY25MACCSpecs12FEB2025.pdf
  • 25R0001_Amend0001-SF30-20250417.pdf
  • 25R0001_Amend0002-SF30-20250428.pdf
  • 25R0001_Atch11_FOPR_GJKZ1149058.pdf
  • SOWAtchD1-15PcntConceptPlan.pdf
  • SOWAtchE-BasisofDesignEqpmnt.pdf
  • 25R0001_Atch11B_FOPR_GJKZ1149058-Atch2-SOW20DEC2024.pdf
  • SOWAtchD2-15PcntConcept+Plan.pdf
  • 25R0001_Atch8-PastPerfCvrLtrQuestionnaire.pdf
  • 25R0001_Atch7C-WA20250001-Highway20250321.pdf
  • SOWAtchB-PhotosB2256_2257_2258_2259.pdf
  • 25R0001_Atch9-PastPerformanceInfo.pdf
  • 25R0001_Atch7D-WA20250095-Residential20250207.pdf
  • 25R0001_Atch7B-WA20250130-Heavy20250207.pdf
  • 25R0001_Atch12-OrientationSmnrSOW.pdf
  • 25R0001_Atch2-2025BDGSpecs11MAR2025.pdf
  • 25R0001_Atch4-2018FAFBIFS26JUN2018.pdf
  • 25R0001_Atch3-2025BDGDataSheets.pdf
  • SOWAtchA-SiteHaulRoute.pdf
  • 25R0001_Atch6-RealIDActPamphlet.pdf
  • 25R0001_Atch5-FAFBClimateWeatherData.pdf
  • 25R0001_PreProposalSiteVisitSignIn-20250428.pdf