FY25 Multiple Award Construction Contract (MACC)
SAM.GOV
Due: May 15, 2025 at 04:00 PM UTC
In-Active Solicitation SBA Source Url

Summary

The FY25 Multiple Award Construction Contract (MACC) is a solicitation for an Indefinite Delivery, Indefinite Quantity (IDIQ) contract aimed at providing construction services at Fairchild Air Force Base, Washington. This contract will encompass a wide range of construction activities, including maintenance, repair, and new construction projects, with a focus on design-build efforts. Contractors bidding on this opportunity should be capable of handling various construction trades such as carpentry, electrical, plumbing, and demolition, and must be prepared to respond quickly to urgent needs, particularly during natural disasters or life/safety issues. The project is set aside for small businesses, and the total program value is capped at $95 million over a five-year period, with a potential two-year extension.
Description

UPDATE:  5/1/2025 - AMENDMENT 0003

Amendment 0003 is to answer questions proposed by prospective contractors related to the SF1442 for the
FY25 MACC Solicitation. Please refer to Section C and revisions to Section L under Summary of Changes.


Entities
DOD
Department of Defense
DOTAF
Department of the Air Force
NAICS
236220
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Fairchild AFB , Washington 99011
Point of Contact
Full Name Email Phone Type
Richard Hedrick [email protected] 5092474867 primary
Tuyen Nguyen [email protected] 5092472072 secondary
Attachments
  • 25R0001_Atch11A_FOPR_GJKZ1149058-Atch1-PriceSchedule.pdf
  • 25R0001_SF1442-20250414.pdf
  • 25R0001_Atch7A-WA20250114-Building20250214.pdf
  • 25R0001_Amend0003-SF30-20250501.pdf
  • SOWAtchC-15PcntConceptDemoPlan.pdf
  • SOWAtchF-ExistingB2256Drwgs.pdf
  • 25R0001_Atch1-FY25MACCSpecs12FEB2025.pdf
  • 25R0001_Amend0001-SF30-20250417.pdf
  • 25R0001_Amend0002-SF30-20250428.pdf
  • 25R0001_Atch11_FOPR_GJKZ1149058.pdf
  • SOWAtchE-BasisofDesignEqpmnt.pdf
  • 25R0001_Atch11B_FOPR_GJKZ1149058-Atch2-SOW20DEC2024.pdf
  • SOWAtchD2-15PcntConcept+Plan.pdf
  • 25R0001_Atch8-PastPerfCvrLtrQuestionnaire.pdf
  • 25R0001_Atch7C-WA20250001-Highway20250321.pdf
  • SOWAtchB-PhotosB2256_2257_2258_2259.pdf
  • 25R0001_Atch9-PastPerformanceInfo.pdf
  • 25R0001_Atch7D-WA20250095-Residential20250207.pdf
  • 25R0001_Atch7B-WA20250130-Heavy20250207.pdf
  • 25R0001_Atch12-OrientationSmnrSOW.pdf
  • 25R0001_Atch2-2025BDGSpecs11MAR2025.pdf
  • 25R0001_Atch4-2018FAFBIFS26JUN2018.pdf
  • 25R0001_Atch3-2025BDGDataSheets.pdf
  • SOWAtchA-SiteHaulRoute.pdf
  • 25R0001_Atch6-RealIDActPamphlet.pdf
  • 25R0001_Atch5-FAFBClimateWeatherData.pdf
  • 25R0001_PreProposalSiteVisitSignIn-20250428.pdf