FY25 Multiple Award Construction Contract (MACC)
SAM.GOV
Due: May 15, 2025 at 04:00 PM UTC
In-Active Solicitation SBA Source Url

Summary

The FY25 Multiple Award Construction Contract (MACC) is a solicitation for construction services at Fairchild Air Force Base, Washington, aimed at providing indefinite delivery and indefinite quantity (IDIQ) design-build construction efforts. The scope of work encompasses a wide range of construction activities, including maintenance, repair, and new construction projects, with specific tasks such as facility upgrades, utility work, and airfield pavement. Contractors with expertise in general construction, particularly those capable of handling various trades like carpentry, electrical, plumbing, and demolition, are encouraged to bid. This opportunity is set aside for small businesses, emphasizing the need for contractors who can respond quickly to emergencies and support Air Force mission-critical operations.
Description

UPDATE:  4/17/2025 - AMENDMENT 0001 - Q&A for FY25 MACC

AMENDMENT 0001 is to answer questions proposed by prospective contractors for the FY25 MACC Solicitation.

ATTACHMENT:  25R0001_Amend0001-SF30-20250417

====================================================

Entities
DOD
Department of Defense
DOTAF
Department of the Air Force
NAICS
236220
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Fairchild AFB , Washington 99011
Point of Contact
Full Name Email Phone Type
Richard Hedrick [email protected] 5092474867 primary
Tuyen Nguyen [email protected] 5092472072 secondary
Attachments
  • 25R0001_Atch11A_FOPR_GJKZ1149058-Atch1-PriceSchedule.pdf
  • 25R0001_SF1442-20250414.pdf
  • 25R0001_Atch7A-WA20250114-Building20250214.pdf
  • 25R0001_Atch10-SubKTRTeamingArrngmntRelease.pdf
  • SOWAtchC-15PcntConceptDemoPlan.pdf
  • SOWAtchF-ExistingB2256Drwgs.pdf
  • 25R0001_Atch1-FY25MACCSpecs12FEB2025.pdf
  • 25R0001_Amend0001-SF30-20250417.pdf
  • 25R0001_Atch11_FOPR_GJKZ1149058.pdf
  • SOWAtchD1-15PcntConceptPlan.pdf
  • SOWAtchE-BasisofDesignEqpmnt.pdf
  • 25R0001_Atch11B_FOPR_GJKZ1149058-Atch2-SOW20DEC2024.pdf
  • SOWAtchD2-15PcntConcept+Plan.pdf
  • 25R0001_Atch8-PastPerfCvrLtrQuestionnaire.pdf
  • 25R0001_Atch7C-WA20250001-Highway20250321.pdf
  • SOWAtchB-PhotosB2256_2257_2258_2259.pdf
  • 25R0001_Atch9-PastPerformanceInfo.pdf
  • 25R0001_Atch7D-WA20250095-Residential20250207.pdf
  • 25R0001_Atch7B-WA20250130-Heavy20250207.pdf
  • 25R0001_Atch12-OrientationSmnrSOW.pdf
  • 25R0001_Atch2-2025BDGSpecs11MAR2025.pdf
  • 25R0001_Atch4-2018FAFBIFS26JUN2018.pdf
  • 25R0001_Atch3-2025BDGDataSheets.pdf
  • SOWAtchA-SiteHaulRoute.pdf
  • 25R0001_Atch6-RealIDActPamphlet.pdf
  • 25R0001_Atch5-FAFBClimateWeatherData.pdf