FY25 Multiple Award Construction Contract (MACC)
SAM.GOV
Due: May 15, 2025 at 04:00 PM UTC
In-Active Solicitation SBA Source Url

Summary

The FY25 Multiple Award Construction Contract (MACC) is a solicitation for an Indefinite Delivery, Indefinite Quantity (IDIQ) contract aimed at providing construction services at Fairchild Air Force Base, Washington. This contract will encompass a wide range of construction activities including maintenance, repair, and new construction projects, with specific tasks involving facility upgrades, utility work, and various trades such as carpentry, plumbing, and electrical work. Contractors interested in this opportunity should be small businesses capable of responding quickly to urgent needs, particularly in situations involving natural disasters or life/safety issues. The contract is set aside for small businesses, and the total program value is capped at $95 million over a five-year period, with a focus on delivering quality construction services efficiently and effectively.
Description

UPDATE:  5/9/2025 - AMENDMENT 0006

Amendment 0006 is to answer questions proposed by prospective contractors for the FY25 MACC Seed Project:  GJKZ1149058 - Replace Dormitory Boilers, Multi. Please refer to Summary of Changes.under Section C.

ATTACHMENTS: <

Entities
DOD
Department of Defense
DOTAF
Department of the Air Force
NAICS
236220
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Fairchild AFB , Washington 99011
Point of Contact
Full Name Email Phone Type
Richard Hedrick [email protected] 5092474867 primary
Tuyen Nguyen [email protected] 5092472072 secondary
Attachments
  • 25R0001_Atch11A_FOPR_GJKZ1149058-Atch1-PriceSchedule.pdf
  • 25R0001_SF1442-20250414.pdf
  • 25R0001_Atch7A-WA20250114-Building20250214.pdf
  • 25R0001_Amend0003-SF30-20250501.pdf
  • 25R0001_Atch10-SubKTRTeamingArrngmntRelease.pdf
  • SOWAtchC-15PcntConceptDemoPlan.pdf
  • SOWAtchF-ExistingB2256Drwgs.pdf
  • 25R0001_Atch1-FY25MACCSpecs12FEB2025.pdf
  • 25R0001_Amend0001-SF30-20250417.pdf
  • 25R0001_Amend0002-SF30-20250428.pdf
  • 25R0001_Atch11_FOPR_GJKZ1149058.pdf
  • SOWAtchF_Amend0005ExistingB2256Drwgs.pdf
  • SOWAtchD1-15PcntConceptPlan.pdf
  • SOWAtchE-BasisofDesignEqpmnt.pdf
  • 25R0001_Atch11B_FOPR_GJKZ1149058-Atch2-SOW20DEC2024.pdf
  • SOWAtchD2-15PcntConcept+Plan.pdf
  • 25R0001_Atch8-PastPerfCvrLtrQuestionnaire.pdf
  • 25R0001_Atch7C-WA20250001-Highway20250321.pdf
  • SOWAtchB-PhotosB2256_2257_2258_2259.pdf
  • 25R0001_Atch9-PastPerformanceInfo.pdf
  • 25R0001_Atch7D-WA20250095-Residential20250207.pdf
  • 25R0001_Atch7B-WA20250130-Heavy20250207.pdf
  • 25R0001_Atch12-OrientationSmnrSOW.pdf
  • 25R0001_Atch2-2025BDGSpecs11MAR2025.pdf
  • 25R0001_Atch4-2018FAFBIFS26JUN2018.pdf
  • 25R0001_Amend0004-SF30-20250508.pdf
  • 25R0001_Amend0006-SF30-20250509.pdf
  • 25R0001_Amend0005-SF30-20250508.pdf
  • 25R0001_Atch3-2025BDGDataSheets.pdf
  • SOWAtchA-SiteHaulRoute.pdf
  • 25R0001_Atch6-RealIDActPamphlet.pdf
  • 25R0001_Atch5-FAFBClimateWeatherData.pdf
  • 25R0001_PreProposalSiteVisitSignIn-20250428.pdf