GAOA Forest Wide Toilet Replacement and Installation
SAM.GOV
Due: May 21, 2025 at 09:00 PM UTC
In-Active Solicitation SBA Source Url

Summary

The GAOA Forest Wide Toilet Replacement and Installation project involves the replacement and installation of toilet facilities across various recreation sites within the Beaverhead-Deerlodge National Forest in Montana. This opportunity is particularly suited for small businesses specializing in construction and installation services, particularly those with experience in public works projects and environmental considerations. Contractors will be responsible for removing existing vault toilets and installing new precast concrete structures, ensuring compliance with the specifications outlined in the solicitation documents. The project is set aside for small businesses, emphasizing the need for qualified bidders who can meet the requirements and timelines specified in the solicitation.
Description

GAOA Forest Wide Toilet Replacement and Installation

Amendment0001, replaces SF1442 and includes large Attachment 3 Drawings/Plans document as a ZIP File

Entities
ADO
Department of Agriculture
FS
Forest Service
NAICS
238910
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Dillon , Montana
Point of Contact
Full Name Email Phone Type
Paula Sales [email protected] 865-789-8415 primary
Lisa Rakich [email protected] 406-491-0561 secondary
Attachments
  • Attach+3+DrawingsPlans.zip
  • 1240LU25B0003.pdf
  • QuestionsAnswers_4.24.2025.pdf
  • Attachment+1+Schedule+of+Items.docx
  • Attachment+2+FSSS.pdf
  • Attachment+4+Wage+Determination.pdf
  • SF1442_Amend001_1240LU25B0003.pdf