GAOA Monday Creek Trailhead Bridge Rehabilitation
SAM.GOV
Due: May 9, 2025 at 05:00 PM UTC
In-Active Solicitation SBA Source Url

Summary

The GAOA Monday Creek Trailhead Bridge Rehabilitation project involves the comprehensive rehabilitation of the bridge at the Monday Creek Trailhead located in the Wayne National Forest, Ohio. The contractor will be responsible for removing the existing deck, bridge rail, and superstructure, and installing a new superstructure on the existing abutments, along with additional features such as riprap protection, road surfacing, and site stabilization. This project is a total small business set-aside, making it an ideal opportunity for small construction firms with experience in bridge rehabilitation and related infrastructure projects. Contractors should be prepared to adhere to federal specifications and safety regulations throughout the project duration, which is expected to be completed within a specified timeframe after the notice to proceed is issued.
Description

The contractor shall provide all material, labor, and other incidentals necessary to complete the Monday Creak Trailhead Bridge Rehabilitation in accordance with all contract terms and conditions, Schedule of Items, Statement of Work, Plans, Supplemental Specifications, and other attachments.


Entities
ADO
Department of Agriculture
FS
Forest Service
NAICS
237310
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Nelsonville , Ohio 45764
Point of Contact
Full Name Email Phone Type
BOUCHER, PAUL A [email protected] primary
Brad Higley [email protected] secondary
Attachments
  • Sol_12445525B0002.pdf
  • Att+01_Schedule+of+Items+%28250320%29.docx
  • Att+03_Plans+%28240502%29.pdf
  • Att+04_FSSS+%28250225%29.pdf
  • Att+05_Location+Map+%28250225%29.pdf
  • Att+02_SOW+%28250225%29.pdf
  • Att+06_Wage+Rates+%28250314%29.pdf