Garrison Dam Spillway Modification Project - Phase 2 Anchor Testing
SAM.GOV
Due: April 22, 2025 at 07:00 PM UTC
In-Active Solicitation Source Url

Summary

The Garrison Dam Spillway Modification Project - Phase 2 Anchor Testing is a solicitation issued by the U.S. Army Corps of Engineers, focusing on the installation and testing of foundation anchors in the spillway chute and stilling basin of the Garrison Dam in North Dakota. This phase aims to construct concrete anchor pads and perform extensive testing to ensure the anchors can withstand design loads, thereby enhancing the dam's structural integrity. Contractors with expertise in geotechnical engineering, foundation construction, and anchor testing are encouraged to bid on this opportunity, particularly those familiar with ASTM standards and capable of handling complex drilling and testing operations in challenging geological conditions.
Description

***Amendment 0002 Posted 15 April 2025***

***Amendment 0001 Posted 10 April 2025***

The solicitation has been posted with all attachments for the Garrison Dam Spillway Modification (GSDM) Anchor Testing Phase 2 requirement. The site visit is scheduled for 3 April 2025. Please see

Entities
DOD
Department of Defense
DOTA
Department of the Army
NAICS
541380
Set Aside
None
Place of Performance
Riverdale , North Dakota 58565
Point of Contact
Full Name Email Phone Type
Clinton Russell [email protected] primary
Nadine Catania [email protected] secondary
Attachments
  • 4007+-+Attachment+VII+-+Anchors+Phase+2+Geotechnical+Data+Report_Volume+I_20250318.pdf
  • Updated+Drawing+-+GR00108C-101.pdf
  • 4004+-+Attachment+IV+-+Submittal+Form+4025-R.pdf
  • 4000+-+2025.03.17_Performance+Work+Statement+for+GDSM+Anchor+Inv+Phase+2+FRS.pdf
  • 4002+-+Attachment+II+-+Foundation+Anchor+Verification+and+Modified+Extended+Creep+Test+Steps.pdf
  • 4001+-+Attachment+I+-+Submittal+Items+and+Schedule.pdf
  • Updated+Drawing+-+GR00108C-102.pdf
  • 4006+-+Attachment+VI+-+GDSM+Utilities+Survey+2023.pdf
  • Updated+Drawing+-+GR00108S-101.pdf
  • 4005+-+Attachment+V+-+GDSM+Anchors+Phase+2+DIPP_20250318.pdf
  • Amendment+0002+-+W9128F25QA0100002.pdf
  • 2000+-+Price+Schedule+for+GDSM_PH2+Anchor+Program.pdf
  • 4003+-+Attachment+III+-+Phase+2+Anchor+Investiagion+Drawings.pdf
  • Site+Visit+Attendance+-+Garrison+Spillway+Anchor+Testing+-+3+Apr+2025.pdf
  • Amendment+0001+-+W9128F25QA010.pdf
  • Updated+Drawing+-+GR00108S-503.pdf
  • 1000+-+Instructions+to+Offerors+with+Provision+52.212-2+and+Site+Visit+Info.pdf
  • 3000+-+SCA+2015-5383+Rev+24+23+Dec+2024+-+McLean+County+ND.pdf
  • W9128F25QA010_Solicitation+for+GDSM+Anchor+Testing+Phase+2.pdf
  • 4000+-+2025.04.15_Performance+Work+Statement+for+GDSM+Anchor+Inv+Phase+2+FRS.pdf