Gavin's Point Powerhouse DC and Low Voltage Panel Board Replacement
SAM.GOV
Due: July 16, 2025 at 07:00 PM UTC
In-Active Solicitation SBA Source Url

Summary

The opportunity for the Gavin's Point Powerhouse DC and Low Voltage Panel Board Replacement involves a significant electrical upgrade project at the Gavin's Point Powerhouse in Crofton, Nebraska. The work includes replacing the entire lineup in the Control Room for DC, preferred AC, and 480V circuits, relocating 480V breakers, and replacing a section of main feeder wires. Optional work may include replacing lighting panels and transformers. This project is set aside for small businesses, making it an ideal opportunity for electrical contractors with experience in similar projects. Interested contractors should be prepared to manage a project with an estimated construction cost between $1,000,000 and $5,000,000 and a performance period of 600 calendar days after the Notice to Proceed.
Description

Amendment 0001 has been posted to SAM.gov. Proposal due date extended to 16 July 2025. Reminder that this amendment must be acknowledged and submitted with an offer. 

*********************************************************************************************************************

Entities
DOD
Department of Defense
DOTA
Department of the Army
NAICS
238210
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Crofton , Nebraska 68730
Point of Contact
Full Name Email Phone Type
Brandie (Stallsworth) Murphy [email protected] primary
Daniel D. Monahan [email protected] secondary
Attachments
  • W9128F25RA018+GP+DC+and+Low+Panel+Solicitation+Drawings.PDF
  • Solicitation+-+W9128F25RA018.pdf
  • Attachment+1+Pricing+Schedule+W9128F25RA018.pdf
  • W9128F25RA018+GP+DC+and+Lower+Panel+Specs.pdf
  • Davis+Bacon+Wage+Determination+NE20250078+3.14.2025pdf.pdf
  • Attachment+2+Sections+00+21+00+and+00+22+00.pdf
  • Site+Visit+Gavins+Point+DC+Panelboard+6.25.25.pdf