GSU Transformer Supply, Oahe Dam, SD & Ft Peck Dam, MT
SAM.GOV
Due: August 6, 2025 at 07:00 PM UTC
In-Active Solicitation Source Url

Summary

The GSU Transformer Supply opportunity involves the design, manufacturing, and delivery of generator step-up (GSU) transformers for the Oahe Dam in South Dakota and the Fort Peck Dam in Montana. The project requires contractors to produce a total of 12 transformers, including 10 for Oahe Dam and 2 for Fort Peck Dam, along with ancillary components. Contractors will also be responsible for factory acceptance testing, delivery, reassembly, oil processing, and final acceptance testing after interconnection to the power plants. This opportunity is suitable for businesses specializing in power, distribution, and specialty transformer manufacturing, particularly those with experience in large-scale electrical equipment projects and compliance with government contracting requirements.
Description

Project Description:
Ft Peck
Supply of the generator step-up (GSU) transformers 4 and 5 located in switchyard #2 at the Fort Peck Dam. The final suppy contract for the Fort Peck transformers will include:

  • Design and manufacturing of two new GSU transformer
Entities
DOD
Department of Defense
DOTA
Department of the Army
NAICS
335311
Set Aside
None
Place of Performance
Fort Pierre , South Dakota 57532
Point of Contact
Full Name Email Phone Type
Brandie Murphy [email protected] primary
Marc Proietto [email protected] secondary
Attachments
  • Attachment-1+Price+Schedule.pdf
  • Attachment-5+OA_FP+GSU+Transformer+Supply+specs.pdf
  • Attachment-4+OA_FP+GSU+Transformer+Contract+Drawings+2+of+3.pdf
  • Attachment-2+Fort+Peck+GSU+Transformer+Reference+Drawings.pdf
  • Solicitation+-+W9128F25RA053.pdf
  • Attachment-3+Oahe+GSU+Transformer+Reference+Drawings.pdf
  • Attachment-4+OA_FP+GSU+Transformer+Contract+Drawings+3+of+3.pdf
  • Attachment-4+OA_FP+GSU+Transformer+Contract+Drawings+1+of+3.pdf
  • Addendum+to+52.212-2.pdf