H--Fire Protection Sys Inspect/Test - 12 AK Parks
SAM.GOV
Due: May 1, 2025 at 09:00 PM UTC
In-Active Combined Synopsis/Solicitation SBA Source Url

Summary

The opportunity titled 'H--Fire Protection Sys Inspect/Test - 12 AK Parks' involves the inspection, testing, and maintenance of fire protection systems across twelve national parks in Alaska. The contractor will be responsible for ensuring that various fire suppression and alarm systems are operational and compliant with the National Fire Protection Association (NFPA) standards. This includes conducting annual inspections and tests on fire alarms, sprinkler systems, clean agent systems, and backflow preventers, among others. Contractors with expertise in fire protection engineering, particularly those familiar with NFPA codes and standards, as well as experience in servicing multiple systems in remote locations, are encouraged to bid on this project. The work requires a high level of detail and adherence to safety regulations, making it suitable for small businesses specializing in fire safety and inspection services.
Entities
IDOT
Department of the Interior
NPS
National Park Service
NAICS
541350
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Point of Contact
Full Name Email Phone Type
Bunch, Ronald [email protected] 9072017719 primary
Attachments
  • B09_Attachment_1_2025_NPS_AKR_Structural_Fire_Asset_Details_-_Amend_01_0001.pdf
  • B08_Attachment_8_-_Fire_Pump_Test_Form.pdf
  • B08_Attachment_5_-_Clean_Agent_and_CO2_Test_Form.pdf
  • B08_Attachment_9_-_Fire_Sprinkler_Test_Form.pdf
  • B08_Attachment_10_-_Inventory_Form_Vez.xls
  • B03_Attachment_12_-_Dol_WD_2015-5681_Rev_22.pdf
  • B03_Attachment_15_-_DOL_WD_2015-5687_Rev_24.pdf
  • B09_QUESTIONS_AND_ANSWERS_0001.pdf
  • B08_Attachment_1_-_Scope_of_Services.pdf
  • B03_Attachment_14_-_DOL_WD_2015-5685_Rev_24.pdf
  • Sol_140P9725Q0013_Amd_0002.pdf
  • B08_Attachment_4__-_Backflow_Prevention_Device_Test_Form.pdf
  • B09_SOS_AKR_Structural_Fire_ITM_-_Amend_01_0001.pdf
  • B08_Attachment_6_-_Dry_Chemical_Test_Form.pdf
  • B08_Attachment_11_-_Example_Structural_Fire_Deficiency_Log.pdf
  • B08_Attachment_3_-_DENA_Coordination_Requirements.pdf
  • B08_Attachment_2_-_Structural_Fire_Asset_Details.pdf
  • Sol_140P9725Q0013.pdf
  • B08_Attachment_7_-__Fire_Alarm_Test_Form.pdf
  • Sol_140P9725Q0013_Amd_0001.pdf
  • B03_Attachment_13_-_DOL_WD_2015-5683_Rev_22.pdf