SAM.GOVDue: July 30, 2025 at 07:00 PM UTCIn-ActiveSolicitationSBASource Url
Summary
The Hulah Lake Toe Drain project in Bowring, Oklahoma, involves significant construction and demolition work related to the toe drain system and associated culverts. The scope includes the demolition of the existing toe drain system, which consists of piping, manholes, and relief well connections, as well as the removal of existing toe road culverts. Contractors will be responsible for constructing a new toe drain system that includes perforated and non-perforated piping, precast concrete manholes, and new toe road culverts with reinforced concrete pipe and flared ends. This opportunity is set aside for small businesses, making it ideal for contractors specializing in civil engineering, drainage systems, and related construction services.
Description
PROJECT NARRATIVE/ SUMMARY The work includes, but is not limited to, the following: 1. Demolition of the existing toe drain system, to include toe drain piping, manholes, and relief well connections. This excludes the existing toe drain system between existing manholes 6 and 8.2. Demolition of exist