HVAC Replacement Norfolk International Airport
SAM.GOV
Due: May 29, 2025 at 08:00 PM UTC
In-Active Solicitation Source Url

Summary

The HVAC Replacement project at Norfolk International Airport, managed by the Federal Aviation Administration (FAA), involves significant upgrades to the heating, ventilation, and air conditioning systems within the airport facilities. The estimated construction cost ranges from $1.5 million to $3.5 million, making it a substantial opportunity for contractors specializing in HVAC systems and airport infrastructure. Interested bidders should be prepared to demonstrate their experience in similar projects, particularly in environments that require compliance with FAA regulations and standards. The project includes a mandatory site visit, which, while encouraged, is not a prerequisite for proposal submission. Contractors must also be ready to provide performance and payment bonds as part of their bid submission.
Description

The Federal Aviation Administration (FAA), Terminal Construction Branch (AAQ-550) has a requirement for HVAC Replacement at Norfolk International Airport, Norfolk, VA.

The estimated construction magnitude for these projects is between $1,500,000.00 and $3,500,000.00.  See the attache

Entities
TDO
Department of Transportation
FAA
Federal Aviation Administration
NAICS
238220
Set Aside
None
Place of Performance
Virginia Beach , Virginia 23455
Point of Contact
Full Name Email Phone Type
Sam Culberth [email protected] primary
Karen Czerwiec [email protected] secondary
Attachments
  • 6+QA+dated+Nov+14+24.pdf
  • 11+INTERIM+CLAUSES.pdf
  • 8+ORF+Roof+Replacement+Drawings+%28JCN+1402219%29+%281%29.pdf
  • 4+VA20250160+2+28+25.pdf
  • 697DCK-25-R-00257+16+Apr+2025.pdf
  • 7+ORF+International+Airport+-+Original+Blueprints+%281%29.pdf
  • 10+Past+Experience+Form+-+697DCK-25-R-00257.docx
  • 5+QA+from+January+19+2024.pdf
  • 697DCK-25-R-00257+Amendment+1.pdf
  • 2+ORF+HVAC+-+IFC+DRAWINGS.pdf
  • 9+507441_FAA_ORF_HazMat+Assessment.pdf
  • 1+ORF+HVAC+-+IFC+SPECIFICATIONS.pdf
  • 3+Drawings_Not+Signed+%28Clear+to+Read%29.pdf
  • Q+and+A+for+ORF+HVAC+Replacement+-+14+May+2025.pdf
  • 697DCK-25-R-00257+Amendment+2.pdf
  • AMS+Insurance+Clause+3.4.1-12.pdf
  • Questions+and+Answers+2_May+21+2025.pdf
  • 697DCK-25-R-00257_Amendment+3.pdf
  • Site+Visit+Attendees+ORF+HVAC.pdf