HWY 77 Replace Generator/Automatic Transfer Switch (ATS)
APFS
Due: June 23, 2025 at 12:00 AM UTC
In-Active Forecast Source Url

Summary

The opportunity involves the removal and replacement of an existing propane-fed generator and Automatic Transfer Switch (ATS) at HWY 77. The project requires the installation of a new 120V/208V 3 phase 150 kW propane generator housed in a corrosion-resistant enclosure, along with a new NEMA 3R 600A ATS. The generator must be liquid cooled with an 1800 rpm engine, specifically a Kohler model or an approved equivalent, and it will be connected to an existing 1000-gallon propane tank. Contractors with experience in electrical and generator installation, particularly those familiar with propane systems and ATS installations, should consider bidding on this opportunity.
Description
Remove and replace the existing propane-fed generator and ATS with a new 120V/208V 3 phase 150 kW propane generator in a corrosion-resistant enclosure and a new NEMA 3R 600A Automatic Transfer Switch (ATS). New generator shall be liquid cooled, 1800 rpm engine; Kohler or approved equal. Connect the
Entities
HSDO
Department of Homeland Security
UCABP
U.S. Customs and Border Protection
Contract Type
Firm Fixed Price
Contract Vehicle
Definitive Contract
NAICS
238210