ID BOR SRAO TCROWN(1), Crown Point Trail and Parking Area
SAM.GOV
Due: April 15, 2025 at 09:00 PM UTC
In-Active Solicitation SBA Source Url

Summary

The opportunity ID BOR SRAO TCROWN(1) pertains to the construction of the Crown Point Trail and Parking Area, a project managed by the U.S. Department of Transportation's Federal Highway Administration. This project involves the development of a 2.7-mile multi-use trail along the Lake Cascade shoreline, which includes improvements to the existing trailhead, the addition of a vault toilet, and the repair of erosion issues along the trail. Contractors with experience in trail construction, earthwork, and related infrastructure projects are encouraged to bid, particularly those classified as small businesses due to the total small business set-aside designation. The project requires adherence to federal specifications and standards, making it suitable for contractors familiar with federal highway projects.
Entities
TDO
Department of Transportation
FHA
Federal Highway Administration
NAICS
237310
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Cascade , Idaho
Point of Contact
Full Name Email Phone Type
Contracts G. Office [email protected] 3606197520 primary
Attachments
  • IFB_69056724B000021_ID+BOR+SRAO+TCROWN%281%29.pdf
  • BidSum_ID+BOR+SRAO+TCROWN%281%29.pdf
  • BidTabulation_ID+BOR+SRAO+TCROWN%281%29.pdf
  • Physical+Data.zip
  • idr-srao-tcrown1_plans.pdf
  • QA_04-10-2025.pdf
  • Amendment+A001.pdf
  • idr-srao-tcrown1_geo_memo.pdf
  • idr-srao-tcrown1_ewk_combined.pdf
  • QA_04-09-2025.pdf
  • idr-srao-tcrown1_ali.pdf
  • QA_04-04-2025.pdf
  • WFLHD+Construction+Contract+Administration_FY+23+V2.pdf
  • QA_04-08-2025.pdf
  • ID_BOR_SRAO_TCROWN%281%29_sites1-6_control-sheet.xlsx
  • idr-srao-tcrown1_xs.pdf