ID BOR SRAO TCROWN(1), Crown Point Trail and Parking Area
SAM.GOV
Due: April 15, 2025 at 09:00 PM UTC
In-Active Solicitation SBA Source Url

Summary

The opportunity ID BOR SRAO TCROWN(1) pertains to the construction project for the Crown Point Trail and Parking Area, which is a Total Small Business Set-Aside. The project involves the development of a 2.7-mile multi-use trail along the Lake Cascade shoreline, including improvements to the existing trailhead, the addition of a vault toilet, and addressing slope erosion issues. Contractors with experience in trail construction, earthwork, and related infrastructure projects are encouraged to bid, particularly those who can meet the specific material and construction requirements outlined in the solicitation documents.
Description

Update 04/15/2025: Bid Summary posted to attachments.

Update 04/10/2025: Amendment A001 and QA_04-10-2025.pdf posted to attachments.

Update 04/09/2025: QA_04-09-2025.pdf posted to attachments.

Update 04/08/2025:

Entities
TDO
Department of Transportation
FHA
Federal Highway Administration
NAICS
237310
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Cascade , Idaho
Point of Contact
Full Name Email Phone Type
Contracts G. Office [email protected] 3606197520 primary
Attachments
  • IFB_69056724B000021_ID+BOR+SRAO+TCROWN%281%29.pdf
  • BidSum_ID+BOR+SRAO+TCROWN%281%29.pdf
  • Physical+Data.zip
  • idr-srao-tcrown1_plans.pdf
  • QA_04-10-2025.pdf
  • Amendment+A001.pdf
  • idr-srao-tcrown1_geo_memo.pdf
  • idr-srao-tcrown1_ewk_combined.pdf
  • QA_04-09-2025.pdf
  • idr-srao-tcrown1_ali.pdf
  • QA_04-04-2025.pdf
  • WFLHD+Construction+Contract+Administration_FY+23+V2.pdf
  • QA_04-08-2025.pdf
  • ID_BOR_SRAO_TCROWN%281%29_sites1-6_control-sheet.xlsx
  • idr-srao-tcrown1_xs.pdf