IIJA FUNDED - SAT ATCT TERMINAL FACILITY IMPROVEMENT PROGRAM (TFIP)
SAM.GOV
Due: June 26, 2025 at 05:00 PM UTC
In-Active Solicitation Source Url

Summary

The IIJA FUNDED - SAT ATCT TERMINAL FACILITY IMPROVEMENT PROGRAM (TFIP) is a significant opportunity for contractors specializing in commercial and institutional building construction, particularly those with experience in airport facilities. This project involves comprehensive improvements and upgrades to the San Antonio Airport's Air Traffic Control Tower (ATCT) and the associated base building. The scope includes architectural revisions, structural enhancements, and the installation of new mechanical, electrical, and plumbing systems. Contractors with expertise in civil engineering, architectural design, and project management are encouraged to bid, as the project requires a firm-fixed-price contract and adherence to FAA standards and guidelines. The deadline for proposal submissions is June 26, 2025, and interested parties should ensure they are registered in the System for Award Management (SAM).
Entities
TDO
Department of Transportation
FAA
Federal Aviation Administration
NAICS
236220
Set Aside
None
Place of Performance
San Antonio , Texas
Point of Contact
Full Name Email Phone Type
Thuylinh TranNguyen [email protected] primary
Attachments
  • L1+BidBond.pdf
  • J1b+-+SAT+TFIP_FINAL+DESIGN+v4_DESIGN+DATA+HANDBOOK_20250205.pdf
  • J1+-+SAT+TFIP_FINAL+DESIGN+v4_SPECIFICATIONS_20250205.pdf
  • J1a+-+SAT+TFIP_FINAL+DESIGN+v4_DRAWINGS_20250205.pdf
  • L3+Standardized+Proposal+Breakdown.xls
  • J2+WD+-+TX20250241.pdf
  • 697DCK-25-R-00047.pdf
  • L2+Past+Performance+Questionnaire.pdf
  • 697DCK-25-R-00047+Amend+0001.pdf