Installation Entry Control (Main Gate) Facility
SAM.GOV
Due: May 16, 2025 at 05:00 PM UTC
In-Active Solicitation SBA Source Url

Summary

The Installation Entry Control (Main Gate) Facility project involves the construction of a new entry control facility at the 177th Fighter Wing in Egg Harbor Township, New Jersey. This project is a firm fixed-price contract that includes the base bid for the facility and four optional line items, which encompass additional construction tasks such as adding a right turn lane, reconstructing existing pavement, installing drive lane gates and barriers, and providing base entry signage. Contractors with experience in construction, particularly those familiar with military or government projects, are encouraged to bid, especially small businesses as this opportunity is set aside for them. The project requires comprehensive management, supervision, and adherence to various federal regulations and standards, making it suitable for contractors with a strong background in similar construction projects.
Entities
DOD
Department of Defense
DOTA
Department of the Army
NAICS
236220
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Egg Harbor Township , New Jersey 08234
Point of Contact
Full Name Email Phone Type
Jose Maldonado [email protected] 6097616097 primary
Johanna Paz [email protected] 609-761-6096 secondary
Attachments
  • Solicitation+-+W50S8F25RA010.pdf
  • EXHIBIT+B+Installation+Entry+Control+%28Main+Gate%29+Facility.docx
  • Main+Gate+Pre-Proposal+Conference.pdf
  • Exhibit+D_Letter+of+Commitment.docx
  • Limited+Source+Justification+FAR+Part+8.pdf_Redacted.pdf
  • Attachment+1+-+Vol+2+Specifications+AQRC169009+Installation+ECF+B3.pdf
  • Attachment+2+-Drawings+NJANG+ECF+B3+FINAL+-+FULL+SET+with+Options.pdf
  • Exhibit+A+Installation+Entry+Control+%28Main+Gate%29+Facility.docx
  • Attachment+3+-+Installation+Entry+Contro+%28Main+Gate%29l+Facility+-+SOW+AQRC169009.pdf
  • EXHIBIT+C+Reference+Questionnaire+Package+-+Inst+Entry+Ctrl+Fac.docx
  • Attachment+1+-+Vol+1+Specifications+AQRC169009+Installation+ECF+B3.pdf