Installation Entry Control (Main Gate) Facility
SAM.GOV
Due: May 16, 2025 at 05:00 PM UTC
In-Active Solicitation SBA Source Url

Summary

The Installation Entry Control (Main Gate) Facility project at the 177th Fighter Wing in Egg Harbor Township, NJ, is a significant construction opportunity set aside exclusively for small businesses. The project involves the construction of a new entry control facility, which includes the necessary infrastructure such as guard houses, security fencing, and access control systems. Contractors interested in this opportunity should have experience in large-scale construction projects, particularly in building secure facilities, and must be capable of managing all aspects of the project, including labor, materials, and compliance with federal regulations. The estimated construction cost ranges between $5 million and $10 million, and the project is expected to be completed within 600 calendar days after the notice to proceed.
Description

Project Title: Installation Entry Control (Main Gate) Facility
Project Location: 177th FW NJANG

Request for proposals (RFP) to award a single firm fixed-price contract for services, non-personal, to provide all plant, labor, transportation, materials, tools, equipment, appliances an

Entities
DOD
Department of Defense
DOTA
Department of the Army
NAICS
236220
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Egg Harbor Township , New Jersey 08234
Point of Contact
Full Name Email Phone Type
Jose Maldonado [email protected] 6097616097 primary
Johanna Paz [email protected] 609-761-6096 secondary
Attachments
  • Solicitation+-+W50S8F25RA010.pdf
  • EXHIBIT+B+Installation+Entry+Control+%28Main+Gate%29+Facility.docx
  • Main+Gate+Pre-Proposal+Conference.pdf
  • Exhibit+D_Letter+of+Commitment.docx
  • Limited+Source+Justification+FAR+Part+8.pdf_Redacted.pdf
  • Projectmates_Mng_Software_Pricing.pdf
  • Attachment+1+-+Vol+2+Specifications+AQRC169009+Installation+ECF+B3.pdf
  • Attachment+2+-Drawings+NJANG+ECF+B3+FINAL+-+FULL+SET+with+Options.pdf
  • Exhibit+A+Installation+Entry+Control+%28Main+Gate%29+Facility.docx
  • Attendance+Record-01+May+2025.pdf
  • Attachment+3+-+Installation+Entry+Contro+%28Main+Gate%29l+Facility+-+SOW+AQRC169009.pdf
  • EXHIBIT+C+Reference+Questionnaire+Package+-+Inst+Entry+Ctrl+Fac.docx
  • Attachment+1+-+Vol+1+Specifications+AQRC169009+Installation+ECF+B3.pdf