Installation Entry Control (Main Gate) Facility
SAM.GOV
Due: May 30, 2025 at 05:00 PM UTC
In-Active Solicitation SBA Source Url

Summary

The Installation Entry Control (Main Gate) Facility project at the 177th Fighter Wing in Egg Harbor Township, NJ, involves the construction of a new entry control facility, including various optional enhancements such as additional lanes and security features. This project is a firm fixed-price contract set aside exclusively for small businesses, with a construction budget estimated between $5 million and $10 million. Contractors interested in bidding should have experience in similar construction projects, particularly in building secure facilities, and must be capable of providing all necessary labor, materials, and supervision. The project requires compliance with specific federal regulations and standards, making it essential for bidders to be familiar with government contracting processes and requirements.
Entities
DOD
Department of Defense
DOTA
Department of the Army
NAICS
236220
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Egg Harbor Township , New Jersey 08234
Point of Contact
Full Name Email Phone Type
Jose Maldonado [email protected] 6097616097 primary
Johanna Paz [email protected] 609-761-6096 secondary
Attachments
  • Solicitation+-+W50S8F25RA010.pdf
  • EXHIBIT+B+Installation+Entry+Control+%28Main+Gate%29+Facility.docx
  • Main+Gate+Pre-Proposal+Conference.pdf
  • Exhibit+D_Letter+of+Commitment.docx
  • Limited+Source+Justification+FAR+Part+8.pdf_Redacted.pdf
  • Projectmates_Mng_Software_Pricing.pdf
  • Main+Gate+RFI+log+published+9+May+2025.pdf
  • Attachment+1+-+Vol+2+Specifications+AQRC169009+Installation+ECF+B3.pdf
  • Attachment+2+-Drawings+NJANG+ECF+B3+FINAL+-+FULL+SET+with+Options.pdf
  • Exhibit+A+Installation+Entry+Control+%28Main+Gate%29+Facility.docx
  • Attendance+Record-01+May+2025.pdf
  • Attachment+3+-+Installation+Entry+Contro+%28Main+Gate%29l+Facility+-+SOW+AQRC169009.pdf
  • EXHIBIT+C+Reference+Questionnaire+Package+-+Inst+Entry+Ctrl+Fac.docx
  • Attachment+1+-+Vol+1+Specifications+AQRC169009+Installation+ECF+B3.pdf
  • Wage+Determinations+NJ20250025+2+May+2025.pdf
  • Solicitation+Amendment+W50S8F25RA0100001+SF+30.pdf
  • Atlantic+City+ANGB+ECF+Addendum+01.pdf
  • Solicitation+Amendment+W50S8F25RA0100002+SF+30.pdf
  • FINAL+COPY+16May25+BID+RFI+LOG-ENTRY+CONTROL+FACILITY-ATLANTIC+CITY+ANGB.pdf
  • Bulletin+20-01+-+Active+Vehicle+Barrier+%28AVB%29+Safety+Schemes.pdf
  • Atlantic+City+ANGB+ECF+Addendum+03.pdf
  • Solicitation+Amendment+W50S8F25RA0100003+SF+30.pdf
  • Atlantic+City+ANGB+ECF+Addendum+02.pdf