Our AI platform powers the best government contractors to win more.
Be the first to know, bid, and win.
THE WORK CONSISTS OF: Furnish all equipment, materials, and labor necessary to remove portions of an existing intrusion detection system (IDS) and install a new IDS at two (2) project locations; Six (6) buildings at Franklin Falls Dam, Franklin, NH and four (4) buildings at Blackwater Dam, Webste
Full Name | Phone | Type | |
---|---|---|---|
Jennifer M. Samela | [email protected] | 9783188324 | primary |