James Madison Memorial Building- Preventive Maintenance and Emergency Services for Uninterruptible Power Supply (UPS)
SAM.GOV
Due: June 10, 2025 at 06:00 PM UTC
In-Active Combined Synopsis/Solicitation Source Url

Summary

The opportunity involves providing preventive maintenance and emergency services for a 750 kW Uninterruptible Power Supply (UPS) and associated equipment at the James Madison Memorial Building (JMMB). The selected contractor will be responsible for ensuring that all UPS equipment is fully operational and functional, particularly during unexpected power shutdowns. This includes conducting regular maintenance, responding to emergency calls, and providing detailed reports on the condition of the equipment. Contractors with experience in electrical equipment maintenance, particularly UPS systems, and those who can demonstrate compliance with safety and operational standards are encouraged to bid on this opportunity. The contract is expected to be awarded as a firm fixed price agreement, and it is open to all businesses registered in the System for Award Management (SAM).
Description

**AMENDMENT 01 issued 06/02/2025**

___________________________________________________

The Architect of the Capitol (AOC), Supplies and Services Branch (SSB) is issuing this Request for Quote (RFQ) # AOCSSB25Q0028 for Preventive Maintenance and Emergency Services of the 750 kW Uni

Entities
AOTC
Architect of the Capitol
NAICS
335999
Set Aside
None
Place of Performance
Washington , District of Columbia 20540
Point of Contact
Full Name Email Phone Type
Troy Dorsey [email protected] primary
Lily Najera [email protected] secondary
Attachments
  • J.11+USCP+Offsite+Vendor+Procedures+%283-28-22%29.pdf
  • J.8+Pricing+sheet+template.xlsx
  • J.9+Sample+Certificate+of+Liability+Insurance+%28COI+-+Master%29+%288-4-22%29.pdf
  • J.7+Instructions+to+Quoters+and+Basis+for+Award+%28L%26M%29.pdf
  • J.1-+SOW-+UPS+prev+maint+and+emerg+services.pdf
  • AOCSSB25Q0028.pdf
  • J.10+USCP+Request+for+Check+of+Criminal+History+%28Form+CP-491%29+%281-21%29.pdf
  • J.12+Wage+Determination+Rev.+33.pdf
  • J.3-+SOW+Attachment+2-+Tasks+2-5-+Option+Years+1-4.pdf
  • J.2-+SOW+Attachment+1-+Task+1-+Base+Year.pdf
  • J.13+AOCSSB25Q0028+Q%26A+Matrix.pdf
  • AOCSSB25Q0028+A001.pdf