James River Reserve Fleet (JRRF) , FB218 Drydock and Repair
SAM.GOV
Due: April 22, 2025 at 06:00 PM UTC
In-Active Combined Synopsis/Solicitation SBA Source Url

Summary

The James River Reserve Fleet (JRRF) opportunity involves a combined synopsis/solicitation for the drydocking and repair of the FB218 Crane Barge, as managed by the Maritime Administration (MARAD). The contractor will be responsible for providing all necessary labor, materials, and equipment to perform the required repairs and maintenance in accordance with the Statement of Work. This project is set aside for small businesses, making it an ideal opportunity for contractors specializing in marine repair and maintenance, particularly those with experience in drydocking operations and compliance with maritime safety and environmental regulations. The work is expected to take place at a facility in the Hampton Roads area, with a performance period of 60 days following the delivery of the vessel.
Description

MARAD intends to award a firm-fixed price purchase order for the drydock and repair of FS218 in accordance with the attached Statement of Work.

Amendment 0001 is issued. Please see attached documents. References not available will be discussed at the site visit.

References

Entities
TDO
Department of Transportation
MA
Maritime Administration
NAICS
336611
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Fort Eustis , Virginia 23604
Point of Contact
Full Name Email Phone Type
William A. Wile [email protected] 7573225806 primary
Robert McDermott [email protected] secondary
Attachments
  • Amdt+0001+6933A225Q000008.pdf
  • Vendor+Price+Sheet+ATTACHMENT+2.xlsx
  • FB218+Deck-Bulwerks-Dimensions.pdf
  • Amendment+0002+6933A225Q000008.pdf
  • FAR+CD+2025+01+02+Attachment+4.pdf
  • Sherwin+Williams+Seaguard+Ablative+Antifouling+Coating.pdf
  • Sherwin+Williams+Seaguard+5000+HS+Epoxy+Application+Bulletin.pdf
  • TAR+1252.217-70.pdf
  • Sherwin+Williams+MIL+DTL+24441+19C+Type+III+F159+Epoxy+Polyamide+Zinc+Rich+Primer.pdf
  • SOW+FB218+YA2025+ATTACHMENT+1.pdf
  • Amdmt+0005+6933A225Q000008.pdf
  • E-Invoicing+Instructions+Attachment+3.pdf
  • Amendment+0003+6933A225Q000008.pdf
  • Q+and+A+Amend+0003+6933A225Q000008.pdf
  • 6933A225Q000008+Drydock+FB-218+Amendment+0004.pdf
  • FB218+DRYDOCK+AND+REPAIR+CSS+6933A225Q000008.pdf