J--HAULOUT OF THE R/V KIYI
SAM.GOV
Due: July 18, 2025 at 09:00 PM UTC
In-Active Combined Synopsis/Solicitation SBA Source Url

Summary

The opportunity titled 'HAULOUT OF THE R/V KIYI' involves the maintenance and inspection of the Research Vessel Kiyi, which is operated by the U.S. Geological Survey (USGS). This project requires a contractor to perform a haul-out, which includes removing the vessel from the water, conducting a thorough inspection, and carrying out necessary maintenance tasks. The work is scheduled to take place between October 1, 2025, and May 1, 2026, to align with the seasonal fisheries research schedule. Contractors with experience in marine maintenance, particularly those familiar with research vessels and the specific requirements of the Great Lakes region, are encouraged to bid on this opportunity. The project is set aside for small businesses, emphasizing the need for compliance with federal acquisition regulations and safety management systems.
Description
Amendment 0006 is being issued to change the proposal due date from August 1, 2025, to July 18, 2025, due to a tight timeline.

Entities
IDOT
Department of the Interior
UGS
US Geological Survey
NAICS
336611
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Point of Contact
Full Name Email Phone Type
Wilson, Mary [email protected] 573-397-2277 primary
Attachments
  • Attachment_A_KIYI_Haulout_Specification_2025.pdf
  • Attachment_C_Schedule_of_Work_Items.docx
  • Attachment_B_PWS_KIYI_Shipyard_2025.pdf
  • Sol_140G0225R0017.pdf
  • B08_Attachment_C_Schedule_of_Work_Items_Rev1_0001.docx
  • Sol_140G0225R0017_Amd_0001.pdf
  • Attachment_4a_25-102-238-R-_Emergency_Helm_Pump_Installation_0002.pdf
  • Attachment_6_D589-660-01-1_Bilge-Ballast_System_0002.pdf
  • Attachment_12_25-102-445-R-_Starlink_Antenna_Mounting_Modification_0002.pdf
  • Attachment_2_589-D610-01-1-_Shafting_Arrangement___Details_0002.pdf
  • Attachment_10_25-102-510-R-_Ventilation_Modifications_0002.pdf
  • Sol_140G0225R0017_Amd_0002.pdf
  • Attachment_11_589-D645-01-1-_Fresh_Water_System_0002.pdf
  • Attachment_14_18-139-260_Keel_Cooler_Modifications_0002.pdf
  • Attachment_13_589-D640-01-1-Engine___Generator_Cooling_0002.pdf
  • Attachment_3_589-D610-02-1-_Bow_Thruster_Details_0002.pdf
  • Attachment_15_SFLC-Std-Spec-0740-%282020%29_0002.pdf
  • Attachment_8_589-D410-01-1-_Hull_Outfit_and_Fittings_0002.pdf
  • Attachment_7_25-102-870-R-_Davit_Modification_0002.pdf
  • Attachment_4_598-D615-01-1-_Steering_Arrangement_and_Details_0002.pdf
  • Attachment_1_589-D501-01-1-_Sonar_and_Transducer_Well_Details_0002.pdf
  • Attachment_5_25-102-225-R-_Shaft_Seal_Modifications_0002.pdf
  • Attachment_9_589-D670-01-1-_Vents_Sounds_and_Sea_Chest_0002.pdf
  • Sol_140G0225R0017_Amd_0003.pdf
  • Sol_140G0225R0017_Amd_0004.pdf
  • Attachment_16_20-127-03-R1__KIYI__Stability_Report_126135316_126153827_0005.pdf
  • Attachment_17_KIYI_Stability_Letter_126152428_0005.pdf
  • Sol_140G0225R0017_Amd_0005.pdf
  • Attachment_18_D105-01-1-_Lines_and_Offsets_0005.pdf
  • Sol_140G0225R0017_Amd_0006.pdf