Our AI platform powers the best government contractors to win more.
Be the first to know, bid, and win.
The following specifications pertain to the cost to re-babbitt and re-surface four sets of journal bearings (8 halves) and re-surface two thrust collars for use at Little Goose Lock and Dam, Dayton, WA.
Full Name | Phone | Type | |
---|---|---|---|
Keree Graves | [email protected] | 5095277204 | primary |
Sara Edwards | [email protected] | 5095277216 | secondary |