Lightning Protection Systems Repair Building 2024 PSFB CO
SAM.GOV
Due: April 15, 2025 at 06:00 PM UTC
In-Active Combined Synopsis/Solicitation SBA Source Url

Summary

The Lightning Protection Systems Repair Building 2024 project at Peterson Space Force Base in Colorado involves the repair of the lightning protection system for Building 2024. The contractor will be responsible for replacing damaged air terminal masts and ensuring compliance with various safety and installation standards, including those set by the National Fire Protection Association and the Lightning Protection Institute. This opportunity is particularly suited for small businesses with experience in lightning protection systems, as it is a total small business set-aside. Contractors must demonstrate a minimum of five years of relevant experience and hold a valid Lightning Protection Institute certification. The project is expected to be completed within 30 calendar days, and all work must be coordinated with the project managers at the base.
Description

Please see attached douments for details.

COMBO B2024 LPS Repair

Attachment 1 Statement of Work B2024 LPS Repair

Attachment 2 B2024 Pictures

Attachment 3 B2024 Roof Plan\

Attachment 4 Provisions and Clauses

Attachment 5 Product Spec Model

At

Entities
DOD
Department of Defense
DOTAF
Department of the Air Force
NAICS
23829
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Colorado Springs , Colorado 80914
Point of Contact
Full Name Email Phone Type
Aaron Smith [email protected] 7195569087 primary
Jason Donovan [email protected] 7195569637 secondary
Attachments
  • Attachment+6+-+B2024+LPS+Repair+Questions+and+Answers.pdf
  • Attachment+4+-+Provisions+and+Clauses.pdf
  • Attachment+5+-+Product+Spec+Model.pdf
  • Attachment+1-+Statement+of+Work++B2024+LPS+Repair.pdf
  • Attachment+3+-B2024+Roof+Plan.pdf
  • COMBO+B2024+LPS+Repair.pdf
  • Attachment+2+-+B2024+LPS+Pictures.pdf