Little Goose Lock and Dam Stilling Basin Sediment Removal
SAM.GOV
Due: April 30, 2025 at 10:00 PM UTC
In-Active Sources Sought Source Url

Summary

The opportunity for the Little Goose Lock and Dam Stilling Basin Sediment Removal involves a construction project aimed at dredging sediment from the stilling basin at Little Goose Dam, located in Washington State along the Snake River. The project requires contractors to clear debris and sediment to expose concrete surfaces for inspection and documentation, which will inform future maintenance and repair actions. The work is expected to be performed by small businesses with experience in similar dredging projects, and it will necessitate the use of specialized equipment and a dive team. Contractors should be prepared to manage safety and health programs in compliance with Corps of Engineers standards, and they must demonstrate their capability through past project experience and relevant certifications.
Description

Little Goose Lock and Dam Stilling Basin Sediment Removal

Sources Sought Notice: W912EF25RSS22

This a follow-up to the Sources Sought issued under Notice ID W912EF25RSS08. The on-site work window has changed. If you responded to W912EF25RSS08, you are encouraged to respon

Entities
DOD
Department of Defense
DOTA
Department of the Army
NAICS
237990
Set Aside
None
Place of Performance
Dayton , Washington 99328
Point of Contact
Full Name Email Phone Type
Preston Jones [email protected] 5095277206 primary