LOLO NATIONAL FOREST - Upper West Fork Fish Creek Trail Bridge Replacement
SAM.GOV
Due: July 7, 2025 at 10:00 PM UTC
In-Active Solicitation SBA Source Url

Summary

The LOLO NATIONAL FOREST - Upper West Fork Fish Creek Trail Bridge Replacement project is a presolicitation opportunity aimed at contractors specializing in construction and infrastructure projects. The work involves the removal and replacement of an existing trail bridge and its substructure on Trail 101, located in the Ninemile Ranger District of Lolo National Forest, Montana. Contractors will be responsible for various tasks including structural excavation, installation of foundation components, and the erection of the new bridge, while adhering to specific resource protection measures due to the project's location within a proposed wilderness area. This opportunity is particularly suited for small businesses, as it is set aside for total small business participation, and requires contractors to have experience in similar construction projects, especially in sensitive environmental areas.
Description

PROJECT DESCRIPTION: The intent of the contract is to remove and replace an existing trail bridge and substructure elements on Trail 101, milepost 3.1 on the Ninemile Ranger District, Lolo National Forest, within the Great Burn ProposedWilderness. The structure is located in Section 19, Township

Entities
ADO
Department of Agriculture
FS
Forest Service
NAICS
237310
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Montana
Point of Contact
Full Name Email Phone Type
Alisha Knaub [email protected] 4064382981 primary
Attachments
  • J4_1240LU25R0011PastPerformanceQuestionnaire.pdf
  • J1_1240LU25R0011WD.pdf
  • J2_1240LU25R0011Plans.pdf
  • J3_1240LU25R0011FSSS.pdf
  • J5_1240LU25R0011SiteVisitQ_A.pdf
  • 1240LU25R0011.pdf
  • 1240LU25R0011QandA.pdf