M2 Pavement Patching at Mendocino NF, Grindstone Ranger District
SAM.GOV
Due: June 12, 2025 at 05:00 PM UTC
In-Active Combined Synopsis/Solicitation SBA Source Url

Summary

The M2 Pavement Patching project at Mendocino National Forest's Grindstone Ranger District involves the removal of existing chip seal and asphalt concrete surfaces, followed by repairs to the surface layer and the establishment of a traffic control plan. This project is a total small business set-aside, making it an excellent opportunity for small contractors specializing in highway, street, and bridge construction. Contractors should be prepared to provide all necessary labor, materials, and equipment to complete the work, which is expected to begin in Summer 2025. The project is located in Willows, California, and has an estimated construction magnitude between $25,000 and $100,000, making it suitable for small businesses with relevant experience in similar projects.
Description

Removal of damaged surface layer(s) of the road (mostly double chip seal with some AC patched areas), Preparation of remaining surfaces, placing of AC patches, and augmentation of shoulder backing along the road.
NAICS - 237310, Highway, Street, and Bridge Construction
PSC -

Entities
ADO
Department of Agriculture
FS
Forest Service
NAICS
237310
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Willows , California 95988
Point of Contact
Full Name Email Phone Type
G. Jeremy Staggs [email protected] 2814821968 primary
Jeremy Bedner [email protected] secondary
Attachments
  • 5.+Drawings+11x17.pdf
  • 2.+Sources+Sought+%28Market+Survey%29.pdf
  • 1.+SF+1442+-+127EAW25R0034+%28NRE+Included%29.pdf
  • 4.+Site+Plan.pdf
  • 9.+SAM.gov+Q%26A.xlsx
  • 3.+Schedule+of+Items.pdf
  • 8.+Davis-Bacon+Act+WD+%23+CA20250007+%28Tehama+County%29.pdf
  • 6.+FP-14.pdf
  • 7.+Evaluation+Factors.pdf