MAINTENANCE DREDGING AT USCG SECTOR COLUMBIA RIVER [FORMERLY MARINE SECURITY UNIT (MSU)] PORTLAND, OR
SAM.GOV
Due: April 18, 2025 at 08:00 PM UTC
In-Active Solicitation SBA Source Url

Summary

The opportunity for maintenance dredging at the USCG Sector Columbia River, formerly the Marine Security Unit (MSU) in Portland, Oregon, involves significant dredging work to remove up to 600 cubic yards of sediment from designated areas. The contractor will be responsible for conducting hydrographic surveys before and after the dredging, ensuring proper disposal of dredged materials at approved sites, and providing real-time monitoring of operations. This project is particularly suited for small businesses specializing in heavy civil engineering construction, particularly those with experience in dredging and environmental compliance. The work must be completed within a specified window from July 1, 2025, to October 31, 2025, and all operations must adhere to environmental regulations and permit conditions.
Description

* NOTE - 20Mar25 - Correct permits have been uploaded.  Be sure you are using the correct permits file titled "APPENDIX B1-21030930_Permits".  All others should be disregarded & discarded.

============================================================================

Entities
HSDO
Department of Homeland Security
UCG
U.S. Coast Guard
NAICS
237990
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Portland , Oregon 97217
Point of Contact
Full Name Email Phone Type
Vincent Yee [email protected] primary
Attachments
  • APPENDIX+C-SPECIFICATIONS-Dredging-Col+River+MSU+Portland.pdf
  • Amendment+0001+-+IFB+70Z08825B0000088-Dredging+MSU-RFIs+1-2.pdf
  • Amendment+0004+-+IFB+70Z08825B0000088-Dredging+MSU-RFI+8.pdf
  • APPENDIX+B2-HydroSurvey.pdf
  • APPENDIX+B3-HydroSurveyAdjustedPrism.pdf
  • Amendment+0002+-WQC-Clarification.pdf
  • APPENDIX+G-CERT+OF+AUTHORIZATION+TO+BIND+CORPORATION+FAR+4.pdf
  • APPENDIX+E-Contractor+Responsibility.pdf
  • Amendment+0004+Attachment+1-MSU+Portland+Sediment+Report.pdf
  • _IFB_70Z08825B0000088_MAINTENANCE+DREDGING+AT+COL+RIVER+MSU+PORTLAND.pdf
  • APPENDIX+D-WAGE+DETERMINATION-OR20250059-MULTNOMAH_28FEB25.pdf
  • Amendment+0002+-+IFB+70Z08825B0000088-Dredging+MSU-RFI+3.pdf
  • APPENDIX+A-SF1442-DREDGE+COL+RIVER+MSU_B0000088.pdf
  • Amendment+0003+-+IFB+70Z08825B0000088-Dredging+MSU-RFIs+4-7.pdf
  • APPENDIX+B1-21030930_Permits.pdf
  • APPENDIX+B4-Historic-Info-2016-Final-Dredge-Prism.pdf
  • APPENDIX+F-Clarification+Request+Form.docx