Manchester Campus Addition Construction at the Manchester Research Station in Port Orchard, Washington
SAM.GOV
Due: April 3, 2025 at 04:00 PM UTC
In-Active Solicitation Source Url

Summary

The Manchester Campus Addition Construction project at the Manchester Research Station in Port Orchard, Washington, is a significant construction opportunity offered by the National Oceanic and Atmospheric Administration (NOAA). This project involves the ground-up construction of a Lab and Office Building, totaling approximately 15,526 gross square feet, and a Recirculating Aquaculture System (RAS) building, which will be about 8,830 gross square feet. The work is intended for contractors with experience in large-scale construction projects, particularly those familiar with laboratory and aquaculture facilities. The total construction budget for the base items is approximately $21.35 million, and the project is open to all businesses, with a small business size standard of $45 million. Interested contractors should be prepared to meet the detailed requirements outlined in the solicitation documents, including adherence to environmental management plans and safety protocols.
Description

Project Title: Manchester Campus Addition Construction at the Manchester Research Station in Port Orchard, Washington

The National Oceanic and Atmospheric Administration (NOAA) has a requirement for a campus addition construction project for the Northwest Fisheries Science Center (NWFSC)

Entities
CDO
Department of Commerce
NOAAA
National Oceanic and Atmospheric Administration
NAICS
236220
Set Aside
None
Place of Performance
Port Orchard , Washington 98366
Point of Contact
Full Name Email Phone Type
Ronette McBean-Felder [email protected] (202) 709-9253 primary
Paul Tucker [email protected] (301) 541-7225 secondary
Attachments
  • J.3_PRELIMINARY+CONSTRUCTION+SITE+PLAN.pdf
  • J.10+PROPOSAL+TEMPLATE+%28Feb+2025%29.xlsx
  • J.5_REVISED+FINAL_EMMP+%28February+2025%29.pdf
  • J.5_Appendix+D_PFAS+Treatment+Monitoring.zip
  • Sol_1305M424R0071_Amd_0001+%28Published+to+SAM.gov+03-12-2025%29.pdf
  • J.5_Appendix+C_Subsurface+Asbestos+-+Clad+Piping.zip
  • FINAL_1305M424R0071_Manchester+Campus+Addition+Construction.pdf
  • Sol_1305M424R0071_Amd_0002+%28Published+to+SAM.gov+03-25-2025%29.pdf
  • J.11+INDIVIDUAL+SUBCONTRACTING+PLAN+TEMPLATE.pdf
  • J.5_Appendix+A_WCSAP.zip
  • MRS+Campus+Additon+Pre-Proposal+Conference+Sign+in+Sheet.pdf
  • J.5_Appendix+B_UST+Removal+Plan.zip
  • J.5_Revised+Final+Addendum_1+EMMP.pdf