MD NP GWMP 6(2) - Design-Build Construction Project - Replacement of the Clara Barton Parkway Cantilever Structure
SAM.GOV
Due: June 26, 2025 at 06:00 PM UTC
In-Active Sources Sought Source Url

Summary

The MD NP GWMP 6(2) opportunity is a Sources Sought announcement issued by the Federal Highway Administration's Eastern Federal Lands Highway Division, aimed at identifying qualified contractors for a significant design-build construction project. This project involves the replacement of the Clara Barton Parkway cantilever structure and the rehabilitation of adjacent retaining walls in Montgomery County, Maryland. The scope includes the removal and replacement of approximately 1,400 linear feet of cantilever structure, rehabilitation of about 2,100 linear feet of retaining walls, and necessary design work for roadway widening and drainage systems. Contractors with experience in large-scale highway construction, particularly those familiar with design-build methodologies and capable of managing complex projects involving multiple stakeholders, are encouraged to express their interest in this opportunity. The estimated project cost ranges from $90 million to $120 million, with a contract award anticipated no earlier than August 2026.
Description

Federal Highway Administration
Eastern Federal Lands Highway Division
Sources Sought Announcement No. 693C73-25-SS-0008
Replacement of Clara Barton Parkway Cantilever Structure 
MD NP GWMP 6(2)


SUBMITTAL INFORMATION: 

ISSUE DATE: MAY 27, 20

Entities
TDO
Department of Transportation
FHA
Federal Highway Administration
NAICS
237310
Set Aside
None
Place of Performance
Maryland
Point of Contact
Full Name Email Phone Type
Jonathan Daly [email protected] None primary
C. Shawn Long [email protected] None secondary
Attachments
  • Sources+Sought+Announcement+No.+693C73-25-SS-0008+-+MD+NP+GWMP+6%282%29.pdf