MI-65 Transfer Piping
SAM.GOV
Due: May 22, 2025 at 09:00 PM UTC
In-Active Solicitation SBA Source Url

Summary

The MI-65 Transfer Piping project at Fermilab involves the demolition and reconstruction of piping that connects two tanks within the MI-65 service building. The existing double wall PVC piping will be replaced with welded stainless steel piping and flanged valves, adhering to ASME B31.3 standards. Contractors with experience in welding, particularly those familiar with ASME standards and capable of managing complex piping systems, are encouraged to bid. The project requires a comprehensive approach, including demolition, welding, and hydrostatic testing, with a timeline that spans from the notice to proceed to project completion within 105 calendar days.
Entities
EDO
Department of Energy
NAICS
332996
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Batavia , Illinois 60510
Point of Contact
Full Name Email Phone Type
Ryan O'Sullivan [email protected] 6308402402 primary
Attachments
  • Exhibit+P+-+Proposal+Certifications+Form+PUR-466_FFDG.pdf
  • Exhibit+I+-+Bond+Bid+FL-41.pdf
  • Exhibit+B2+-+Drawings.pdf
  • Exhibit+A+-+Price+Proposal+Form+Construction.pdf
  • Exhibit+Q+-+Wage+Determination.pdf
  • Exhibit+O+-+SARC_Subcontractor+Annual+RepsCerts+Rev+4_FFDG.pdf
  • Exhibit+T+-+Summary+of+Required+RFP+Submittal+Documents.pdf
  • Exhibit+J+-+Bond+Payment+FL-42.pdf
  • Exhibit+B1+-+Statement+of+Work+-+MI-65+Transfer+Piping.pdf
  • Exhibit+G+-+FFDG+General+Terms+and+Conditions+for+Construction+%2801.2025%29.pdf
  • Exhibit+F+-+014100_Quality_Requirements.pdf
  • Exhibit+S+-+Sitemap.pdf
  • Exhibit+M+-+Fermilab+Subcontractor+Safety+Information+Questionnaire.pdf
  • Exhibit+H+-+2025+Construction+Insurance+Requirements.pdf
  • Exhibit+D+-+013100_ESH_Requirements.pdf
  • Exhibit+B3+-+WELDING+PROCEDURE+SPECIFICATION.pdf
  • Exhibit+L+-+Statement+of+Acknowledgment+%28SF-1413%29.pdf
  • Exhibit+K+-+Bond+Performance+FL-40.pdf
  • Exhibit+R+-+Sample+Subcontract.pdf
  • Exhibit+E+-+013300_Submittals.pdf
  • Exhibit+C+-+010010_General_Requirements.pdf
  • Exhibit+N+-+Construction+Environmental+Safety+Health+Certification.pdf
  • 1.+Request+for+Proposal+-+Read+Me+First.pdf