MI-65 Transfer Piping
SAM.GOV
Due: June 10, 2025 at 09:00 PM UTC
In-Active Solicitation SBA Source Url

Summary

The MI-65 Transfer Piping project involves the demolition and reconstruction of piping that connects two tanks within the MI-65 service building at Fermilab. The existing double wall PVC piping will be replaced with a new welded stainless steel piping system, adhering to ASME B31.3 standards. Contractors with experience in industrial piping systems, particularly those familiar with welding and construction in compliance with stringent safety and engineering standards, are encouraged to bid on this opportunity. The project requires a thorough understanding of demolition processes, material disposal, and the ability to perform hydrostatic testing upon completion of the installation.
Description

You are invited to submit a proposal for the items specified in this Request for Proposal (RFP), by the provisions contained herein, and the terms and conditions of the proposed firm fixed price subcontract entered into as a result of this solicitation.

This is a small business set-aside.

Entities
EDO
Department of Energy
NAICS
332996
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Batavia , Illinois 60510
Point of Contact
Full Name Email Phone Type
Ryan O'Sullivan [email protected] 6308402402 primary
Attachments
  • Exhibit+P+-+Proposal+Certifications+Form+PUR-466_FFDG.pdf
  • Exhibit+I+-+Bond+Bid+FL-41.pdf
  • Exhibit+B2+-+Drawings.pdf
  • Exhibit+A+-+Price+Proposal+Form+Construction.pdf
  • Exhibit+Q+-+Wage+Determination.pdf
  • Exhibit+O+-+SARC_Subcontractor+Annual+RepsCerts+Rev+4_FFDG.pdf
  • Amendment+1+-+ISD-366397-RO.pdf
  • Exhibit+T+-+Summary+of+Required+RFP+Submittal+Documents.pdf
  • Exhibit+J+-+Bond+Payment+FL-42.pdf
  • Exhibit+B1+-+Statement+of+Work+-+MI-65+Transfer+Piping.pdf
  • Exhibit+G+-+FFDG+General+Terms+and+Conditions+for+Construction+%2801.2025%29.pdf
  • Exhibit+F+-+014100_Quality_Requirements.pdf
  • Exhibit+S+-+Sitemap.pdf
  • Exhibit+M+-+Fermilab+Subcontractor+Safety+Information+Questionnaire.pdf
  • Exhibit+H+-+2025+Construction+Insurance+Requirements.pdf
  • Exhibit+D+-+013100_ESH_Requirements.pdf
  • Exhibit+B3+-+WELDING+PROCEDURE+SPECIFICATION.pdf
  • Exhibit+L+-+Statement+of+Acknowledgment+%28SF-1413%29.pdf
  • Exhibit+K+-+Bond+Performance+FL-40.pdf
  • Exhibit+R+-+Sample+Subcontract.pdf
  • Exhibit+E+-+013300_Submittals.pdf
  • Exhibit+C+-+010010_General_Requirements.pdf
  • Exhibit+N+-+Construction+Environmental+Safety+Health+Certification.pdf
  • 1.+Request+for+Proposal+-+Read+Me+First.pdf
  • Amendment+2+-+ISD-366397-RO.pdf
  • MI-65+Transfer+Piping+_+Addendum+1.pdf