MILITARY CONSTRUCTION PROJECT (MILCON) P1062 DESIGN-BID-BUILD, DRY DOCK 3 MODERNIZATION, NORFOLK NAVAL SHIPYARD, PORTSMOUTH, VIRGINIA
SAM.GOV
Due: June 6, 2025 at 06:00 PM UTC
In-Active Solicitation Source Url

Summary

The MILITARY CONSTRUCTION PROJECT (MILCON) P1062 involves a design-bid-build contract for the modernization of Dry Dock 3 at the Norfolk Naval Shipyard in Portsmouth, Virginia. This project aims to enhance the operational capabilities of the dry dock, which is critical for the maintenance and repair of naval vessels. Contractors with expertise in large-scale construction, particularly those experienced in military or naval facility projects, are encouraged to bid. The work will include various construction activities, potentially involving electrical, mechanical, and structural components, and will require adherence to specific military standards and regulations.
Description

Amendment 0003 is issued to:

1. Respond to PPIs.
2. Revise Specifications.
3. Revise Drawings.
4. Provide attachments.
5. Revise the Solicitation.
6. Add FAR Clause 52.216-4 Economic Price Adjustment-Material

Amendment 0002 is issued to:

1. Ex

Entities
DOD
Department of Defense
DOTN
Department of the Navy
NAICS
237990
Set Aside
None
Place of Performance
Portsmouth , Virginia 23709
Point of Contact
Full Name Email Phone Type
Daniel Rocha [email protected] 7573228562 primary
Stephanie Wray [email protected] 7573228172 secondary
Attachments
  • Attachment+N+-+Directions+to+PWD_ROICC+trailer.pdf
  • 1806701-SPC-APPENDIX+G.pdf
  • Attachment+B+-+Past_Performance_Questionnaire+%281%29.docx
  • ATTACHMENT+AF+-+DD3+EPA+Schedule.pdf
  • DON+SAP+Single+Source+%28Schneider+MX1XF%29+-+ELS+Redacted.pdf
  • Attachment+F+-+Individual_Small_Business_Subcontracting_Plan.pdf
  • Attachment+E+-+Small_Business_Participation_Commitment_Document+%281%29.pdf
  • 1806701-DWG-12of15.pdf
  • P1062+DD3+Modernization+Complex+Award+Fee+Plan.pdf
  • 1806701-DWG-6of15.pdf
  • Attachment+W+-+1806701Amend0003-SPC-APPENDIX+K.pdf
  • Attachment+Z+-+DD3+SID+Package.pdf
  • Attachment+K+-+2025+RIOCC+CVS+SPONSOR+NNSY+TEMPLATE.xlsx
  • 1806701-DWG-11of15.pdf
  • 1806701-SPC-APPENDIX+A.pdf
  • 1806701-DWG-5of15.pdf
  • 1806701-DWG-10of15.pdf
  • ATTACHMENT+AD+-+Davis-Bacon+Act+WD++VA20250209.pdf
  • 1806701-SPC-APPENDIX+C.pdf
  • 1806701-SPC-APPENDIX+D.pdf
  • Attachment+C+-+Construction_Experience_Project_Data.docx
  • 1806701-DWG-15of15.pdf
  • Attachment+G+-+Price+Proposal+Form.pdf
  • Attachment+I+-+Approved_Identity_Proofing_Documents.pdf
  • 1806701-DWG-14of15.pdf
  • 1806701-DWG-4of15.pdf
  • Attachment+V+-+1806701Amend0003-SPC-APPENDIX+I.pdf
  • Final_Approved___DON_SAP_Single_Source__Shark_Meters__Redacted.pdf
  • Attachment+Q+-+LANT+JA+HSQ+Technologies_Redacted.pdf
  • ATTACHMENT+AE+-+Award+Fee+Plan.pdf
  • 1806701-SPC-APPENDIX+J.pdf
  • Attachment+AA+-+Site+Visit+Photos.pdf
  • 1806701-SPC-APPENDIX+F.pdf
  • Attachment+X+-+1806701Amend0003+-+DWG.pdf
  • 1806701-DWG-13of15.pdf
  • N6247024R0062+Amendment+0001.pdf
  • 1806701-SPC-APPENDIX+B1.pdf
  • 1806701-DWG-1of15.pdf
  • Attachment+P+-+DD3+RFP+Site+Visit+Handout.pdf
  • 1806701-DWG-9of15.pdf
  • Attachment+L+-+2025+RIOCC+ODP+DBIDS.xlsx
  • 1806701-DWG-3of15.pdf
  • Attachment+Y+-+DD3+FFE+Package.pdf
  • 1806701-DWG-7of15.pdf
  • N6247024R0062.pdf
  • 1806701-SPC-APPENDIX+H.pdf
  • N6247024R0062+0003.pdf
  • Attachment+M+-+SECNAV+5512+exp+2027.pdf
  • 1806701-DWG-8of15.pdf
  • 1806701-SPC-1of1.pdf
  • Attachment+A+-+Pre_Proposal_Inquiry_Log_Template+%281%29.xlsx
  • Attachment+U+-+1806701Amend0003-SPC-APPENDIX+A1.pdf
  • 1806701-DWG-2of15.pdf
  • Attachment+D+-+Historical_Small_Business_Utilization+%282%29.pdf
  • ATTACHMENT+AC+-+Davis-Bacon+Act+WD++VA20250161.pdf
  • Attachment+J+-Criteria+for+Denying+Access+to+Navy+Installations.pdf
  • 1806701-SPC-APPENDIX+B2.pdf
  • Attachment+R+-+LANT+JA+Limitorque_Redacted.pdf
  • ATTACHMENT+AB+-+Davis-Bacon+Act+WD++VA20250001.pdf
  • Revised+Attachment+G+-+Price+Proposal+Form+Amend+0002.pdf
  • 1806701-SPC-APPENDIX+E.pdf
  • N6247024R0062+0002.pdf
  • Attachment+H+-+PIEE_Vendor_Access_Instructions.pdf
  • 1806701-SPC-APPENDIX+I.pdf
  • Attachment+S+-+1806701Amend0002dwg.pdf
  • Attachment+O+-+Site+Visit+Log.pdf
  • Attachment+T+-+DD3+Record+of+Categorical+Exclusion.pdf