MISSISSIPPI RIVER BASIN, ROCK ISLAND ARSENAL, ROCK ISLAND, ILLINOIS, NORTH ANNEX EMERGENCY OPERATIONS CENTER AND DISTRICT CONFERENCE ROOMS
SAM.GOV
Due: April 30, 2025 at 03:00 PM UTC
In-Active Solicitation WOSB Source Url

Summary

The opportunity involves the construction of the North Annex Emergency Operations Center and District Conference Rooms at the Rock Island Arsenal in Rock Island, Illinois. This project is set aside for Women-Owned Small Businesses (WOSB) and has an estimated budget ranging from $5,000,000 to $10,000,000. The work is expected to be completed within 365 consecutive calendar days. Contractors with experience in general construction, particularly those familiar with government contracts and the specific requirements of the U.S. Army Corps of Engineers, are encouraged to bid on this project. The solicitation includes various amendments and technical drawings that provide further details on the scope of work, which includes demolition, HVAC upgrades, and construction of new facilities.
Description

4/15/2025:  Amendment 0002 posted.  Result from questions and answers.  One technical drawing is posted as a result.

4/4/2025:  Amendment 0001 posted - update to site visit information.

ATTENTION: A forthcoming amendment will be updating

Entities
DOD
Department of Defense
DOTA
Department of the Army
NAICS
236220
Set Aside
WOSB : SBA Certified Women-Owned Small Business (WOSB) Program Set-Aside (FAR 19.15)
Place of Performance
Rock Island , Illinois 61201
Point of Contact
Full Name Email Phone Type
Joe Porter [email protected] primary
Jeffrey R. Voss [email protected] 3094459901 secondary
Attachments
  • A22+-+REFERENCE+-+B5CLKTWR199804-PLAN_SET_AS-BLT-1998-09-02-TRAILERS.pdf
  • A22+-+REFERENCE+-+Repair+Annex+Roof.pdf
  • A22+-+REFERENCE+-+2000_JOC_CONTRACT_Clock+Tower+Remodel+IM+Office.pdf
  • A22+-+REFERENCE+-+2000_JOC_CONTRACT_Clock+Tower+Annex+Upgrade+HVAC.pdf
  • A22+-+REFERENCE+-+Remodel+North+End+Annex++N.W.+Corner+Clock+Tower.pdf
  • A22+-+REFERENCE+-+B5CLKTWR202002-PLAN_SET_CONTRACT-2021-08-24.pdf
  • A22+-+SPEC_SOL-2025-03-13.pdf
  • A22+-+PLAN_SET_SOL-2025-03-18.pdf
  • A22+-+Amend+0002+-+Drawing.pdf
  • A22+-+W912EK25BA001+-+AMEND+0001.pdf
  • A22+-+REFERENCE+-+Replace+Chiller+Clock+Tower+bldg.pdf
  • A22+-+W912EK25BA001+-+Only.pdf
  • A22+-+IL+20250001+-+3-21-2025.pdf
  • A22+-+W912EK25BA001+-+AMEND+0002.pdf