Mississippi River, Baton Rouge to the Gulf, Saltwater Barrier Sill, Cutterhead Dredge
SAM.GOV
Due: June 19, 2025 at 10:00 PM UTC
In-Active Sources Sought Source Url

Summary

The U.S. Army Corps of Engineers (USACE), New Orleans District, is seeking capability statements from qualified contractors for a project involving the construction of a saltwater barrier sill on the Mississippi River, specifically between Mile 63.0 and Mile 64.0 Above Head of Passes. This opportunity is categorized as a Sources Sought notice, indicating that it is not a request for proposals but rather a means to gauge the interest and capabilities of potential contractors. The work will primarily involve the use of cutterhead dredging to place hydraulically dredged material sourced from a designated borrow area on the river bottom. Contractors with experience in dredging and surface cleanup activities, particularly those who can demonstrate ownership or access to the necessary dredging equipment, are encouraged to respond. The estimated construction cost ranges from $10 million to $25 million, and the project is expected to be completed within 251 calendar days after the notice to proceed is issued.
Description

THIS IS A SOURCES SOUGHT NOTICE ONLY.  THIS IS NOT A REQUEST FOR PROPOSAL.  THERE WILL NOT BE A SOLICITATION, SPECIFICATIONS, OR DRAWINGS AVAILABLE AT THIS TIME. 

The U.S. Army Corps of Engineers (USACE), New Orleans District (MVN) requests capability state

Entities
DOD
Department of Defense
DOTA
Department of the Army
NAICS
237990
Set Aside
None
Place of Performance
Louisiana
Point of Contact
Full Name Email Phone Type
Cori A. Caimi [email protected] 5048621352 primary
Veronica F. Garner-Flint [email protected] 5048621515 secondary