Missouri River Levee R-562 Repair
SAM.GOV
Due: September 20, 2025 at 07:00 PM UTC
Active
Solicitation SBA Source Url

Summary

The Missouri River Levee R-562 Repair project, managed by the U.S. Army Corps of Engineers, Omaha District, involves extensive structural repairs to the levee system in Peru, Nebraska. The scope of work includes filling scour holes, repairing critical levee sections, addressing crest damages, and rehabilitating drainage structures. This project is particularly suited for small businesses specializing in heavy and civil engineering construction, as it is a total small business set-aside. Contractors interested in this opportunity should be prepared to demonstrate their technical capabilities and past performance in similar projects, as the selection process involves a two-step sealed bidding procedure.
Description

AMD 0006 - This amendment extends the due date of bids indefinately due to a bid protest.

____________________________________________________________________________________

AMD 0005 - This amendment extends the due date for bids until 6 August 2025 at 2:00PM CST.  Another a

Entities
DOD
Department of Defense
DOTA
Department of the Army
NAICS
237990
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Peru , Nebraska 68421
Point of Contact
Full Name Email Phone Type
Karen Caskey [email protected] primary
Lee M Mccormick [email protected] secondary
Attachments
  • Solicitation+Amendment+0003+W9128F25BA0010003+SF+30.pdf
  • R562-step-1-Plans_Vol1.pdf
  • Att+0004+-+NE20250049+Nemaha+Otoe+County+3.14.2025.pdf
  • R562-step-1-Plans_Vol3.pdf
  • R562-step-1-Plans_Vol2.pdf
  • W9128F25BA0010002+SF+30.pdf
  • Att+0001+-+MR-562+BID+SCHEDULE.docx
  • W9128F25BA001+Step+1.pdf
  • Att+0003+-+PPQ+forms.pdf
  • Solicitation+Amendment+W9128F25BA0010001+SF+30.pdf
  • Site+Visit+Attendee+List+5.6.2025.pdf
  • Att+0002+W9128F25BA001+R-562+specs+step1.pdf
  • Solicitation+W9128F25BA0010004+Step+Two.pdf
  • Successful+Step-1+Company+List.docx
  • W9128F25BA001+R-562+Specs+Step+2.pdf
  • Amendment+0004+SF30+W9128F25BA001.pdf
  • Att+0001+BID+SCHEDULE.pdf
  • R562Volume4of6DrawingsCF361_CF621A.pdf
  • R562Volume6of6DrawingsCF901_BI005.pdf
  • R562Volume2of6DrawingsCF256_CF272.pdf
  • R562Volume3of6DrawingsCF300_CF352.pdf
  • R562Volume1of6DrawingsG001_CF256.pdf
  • R562Volume5of6DrawingsCF651_CF871.pdf
  • Amendment+0005+SF30+W9128F25BA0010005.pdf
  • Amendment+0006+SF30+W9128F25BA0010006.pdf