MNA Spillgate Repair Pit Work Platform
SAM.GOV
Due: May 16, 2025 at 05:00 PM UTC
In-Active Solicitation SBA Source Url

Summary

The MNA Spillgate Repair Pit Work Platform opportunity involves the design and construction of a specialized work platform for maintenance tasks at the McNary Dam in Umatilla, Oregon. The platform must be capable of reaching a height of 35 feet and have a length of 50 feet, allowing for the installation of seals along the spillway gate. Contractors with experience in manufacturing heavy-duty lifting equipment, particularly those familiar with electric motor-driven systems and capable of meeting specific safety and operational requirements, are encouraged to bid. This project is set aside for small businesses, making it an excellent opportunity for qualified contractors in the relevant fields.
Entities
DOD
Department of Defense
DOTA
Department of the Army
NAICS
333120
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Umatilla , Oregon 97882
Point of Contact
Full Name Email Phone Type
Chandra D. Crow [email protected] 5095277202 primary
Kristin Hernandez [email protected] secondary
Attachments
  • B.08.03+Solicitation+-+W912EF25QA0110001.pdf
  • B.08.02+Solicitation+-+W912EF25QA011.pdf