SAM.GOVDue: May 16, 2025 at 05:00 PM UTCIn-ActiveSolicitationSBASource Url
Summary
The MNA Spillgate Repair Pit Work Platform opportunity involves the design and construction of a specialized work platform for maintenance tasks at the McNary Dam in Umatilla, Oregon. The platform must be capable of reaching a height of 35 feet and have a length of 50 feet, allowing for the installation of seals along the spillway gate. Contractors with experience in manufacturing heavy-duty lifting equipment, particularly those familiar with electric motor-driven systems and capable of meeting specific safety and operational requirements, are encouraged to bid. This project is set aside for small businesses, making it an excellent opportunity for qualified contractors in the relevant fields.