Murrieta Creek, Phase 2B: Buried Riprap Bank Protection and Ecosystem Restoration
SAM.GOV
Due: June 4, 2025 at 08:00 PM UTC
In-Active Presolicitation SBA Source Url

Summary

The Murrieta Creek, Phase 2B opportunity involves significant construction work focused on buried riprap bank protection and ecosystem restoration. This project includes a variety of tasks such as large-scale excavation, installation of riprap, relocation of existing utilities, and the establishment of a riparian vegetation corridor. Contractors with experience in environmental restoration, excavation, utility relocation, and large-scale civil engineering projects are encouraged to bid. The work will require careful planning and execution to ensure compliance with environmental standards and the protection of existing infrastructure.
Description

Be advised that this is only a pre-soliciation notice.  This notice does not commit the government to a soliciation nor is it a request for proposals or an invitation for bids.   Solicitation should be advertised some time around 5 May 2025.  

The Murriet

Entities
DOD
Department of Defense
DOTA
Department of the Army
NAICS
237990
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Point of Contact
Full Name Email Phone Type
Michael G. Robinson [email protected] 213-452-3311 primary
Ashley Powell [email protected] secondary