Natick Soldier Systems Center Multiple Award Task Order Contract (MATOC) for Construction
SAM.GOV
Due: July 14, 2025 at 05:00 PM UTC
In-Active Solicitation SBA Source Url

Summary

The Natick Soldier Systems Center is seeking proposals for a Multiple Award Task Order Contract (MATOC) for construction services, which will encompass a wide range of general construction-related work. This includes new construction, alterations, renovations, repairs, and design-build projects specifically for the Natick Soldier Systems Center located in Natick, Massachusetts. The contract is structured as an Indefinite Delivery/Indefinite Quantity (IDIQ) with a total shared capacity of $99 million over a potential eight-year period. The government has set aside this opportunity exclusively for small businesses, making it an ideal bidding opportunity for contractors specializing in construction, electrical, and mechanical systems, as well as those experienced in facility renovations and repairs. Interested contractors should be prepared to demonstrate their capabilities through a seed project evaluation as part of the proposal process.
Description

Amendment 9 (July 02,2025) Revised the solicitation to correct Section 00 21 16- Instructions to Proposers to correct proposal submission date and time to 14 July 2025 at 01:00 PM EST.  There are no other changes at this time.  As a result the following documents have b

Entities
DOD
Department of Defense
DOTA
Department of the Army
NAICS
236
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Natick , Massachusetts 01760
Point of Contact
Full Name Email Phone Type
Brandon Rivett [email protected] primary
Martina Biro [email protected] secondary
Attachments
  • Seed+Project+SOW+Attachment+2+-+Integrated+Solid+Waste+Management+Plan.pdf
  • Attachment+3+-+Seed+Project+SOW.pdf
  • Attachment+1+Past+Performance+Questionaire.pdf
  • Seed+Project+SOW+Attachment+5+-+Submittal+Register.pdf
  • Attachment+2+-+Cost+Proposal.xlsx
  • W911QY25R0003+RFP+14MAY2025+v2.pdf
  • Seed+Project+SOW+Attachment+4+-+Quality+Assurance+Surveillance+Plan.pdf
  • Attachment+4+-+NSSC+Contractor+Site+Access+Request+Form.pdf
  • Attachment+5+-+Davis-Bacon+Wage+Determination+MA20250001+Rev5.pdf
  • Seed+Project+SOW+Attachment+1+-+Construction+Drawings+B.45+Seed+Project+%281%29.pdf
  • Seed+Project+SOW+Attachment+3+-+Accident+Prevention+Plan+TOC.pdf
  • W911QY25R0003+Questions+and+Responses+23MAY2025.xlsx
  • W911QY-25-R-0003RFP+amendment+0003+04+June+2025.pdf
  • W911QY-25-R-0003+RFP+amendment+0002+04+June+2025.pdf
  • MATOC+Sign+in+Sheet.xlsx
  • W911QY-25-R-0003-RFP+Conformed+Copy+04+June+2025.pdf
  • EM+385-1-1+_EFFECTIVE+15+March+2024.pdf
  • Attachment+2+Cost+Proposal+Rev+06+18+2025.xlsx
  • W911QY25R0003+Questions+and+Responses+MASTER+06182025.xlsx
  • Tax+Exempt+Form.PDF
  • UFC+4+010.pdf
  • Seed+Project+SOW+Attachment+5+Submittal+Register.docx
  • W911QY-25-R-0003+RFP+amendment+0004+18+June+2025.pdf
  • W911QY-25-R-0003+RFP+amendment+0004+18+June+2025+Conformed+Copy.pdf
  • Bldg45+Reno+Addendum1.pdf
  • Seed+Project+SOW+Attachment+5+Submittal+Register.pdf
  • W911QY25R0003+Questions+and+Responses+Master+06182025.pdf
  • W911QY25R0003+Questions+and+Responses+Master+06262025.pdf
  • W911QY-25-R-0003+RFP+amendment+0005+26+May+2025.pdf
  • W911QY-25-R-0003+RFP+amendment+0005+26+May+2025+Conformed+Copy.pdf
  • Bid+Bond+SF24-23a.pdf
  • W911QY-25-R-0003+RFP+amendment+0001+14+May+2025.pdf
  • W911QY-25-R-0003+RFP+amendment+0006+02+July+2025.pdf
  • W911QY-25-R-0003+RFP+amendment+0006+02+July+2025+Conformed+Copy.pdf