Natural Gas Line Inspection, Test, Maintenance Services, Osan AB
SAM.GOV
Due: May 20, 2025 at 08:00 AM UTC
In-Active Combined Synopsis/Solicitation Source Url

Summary

The opportunity for Natural Gas Line Inspection, Test, Maintenance Services at Osan Air Base involves a non-personal services contract aimed at ensuring the safety and reliability of the natural gas line and its associated systems. Contractors will be responsible for providing comprehensive inspection, testing, maintenance, and repair services, which include managing equipment and facilities to guarantee a stable supply of natural gas. The work requires adherence to various safety regulations and standards, including KGS codes, OSHA, and KOSHA. This opportunity is suitable for businesses with expertise in gas line maintenance and repair, particularly those familiar with military or government contracting environments.
Description

PERFORMANCE WORK STATEMENT(PWS)

Inspection, Test, Maintenance (ITM) and Repair of Natural Gas Line and SystemOsan AB, Republic of KoreaPart 1General Information1.    General Information1.1.    Introduction: This is a non-personal services contract to provide

Entities
DOD
Department of Defense
DOTA
Department of the Army
NAICS
221210
Set Aside
None
Place of Performance
Osan AB 96278
Point of Contact
Full Name Email Phone Type
Chaeyong Yi [email protected] 7576018 primary
SFC Dong H. Kim [email protected] secondary
Attachments
  • Attachment+1+Updated+Performance+Work+Statement.pdf
  • Attachment+3.+PMTL+%28Valve+%26+Patrol%2C+Leakage+Survey%29.pdf
  • Attachment+6.+As-built+Drawing.pdf
  • Attachment+5.+Maintenance+Guidance+from+the+construction+contractor.pdf
  • Attachment+1+Performance+Work+Statement.pdf
  • Attachment+1.2.+Natural+Gas+Using+Facility+Status+%28Phase+2%29.pdf
  • Attachment+2.2.+Natural+Gas+Line+Status+%28Phase+2%29.xlsx
  • Attachment+4.+Manufacturer%27s+Data+Sheet+%26+Instruction+Manual.pdf
  • Attachment+2.1.+Natural+Gas+Line+Status+%28Phase+1%29.xlsx
  • Solicitation+Amendment+-+W90VN625QA0110001.pdf
  • Solicitation+Amendment+W90VN625QA0110001+SF+30.pdf
  • Attachment+7+ADDENDUMs+to+52.212-1+and+52.212-2.pdf
  • Attachment+1.1.+Natural+Gas+Using+Facility+Status+%28Phase+1%29.pdf
  • Solicitation+-+W90VN625QA011.pdf