Nolin River Lake Hoist Replacement Pre-Solicitation Synopsis
SAM.GOV
Due: May 1, 2025 at 11:30 AM UTC
In-Active Presolicitation Source Url

Summary

The Nolin River Lake Hoist Replacement project, managed by the U.S. Army Corps of Engineers (USACE) Louisville District, is set to replace an existing hoist with a new 12-ton capacity hoist at the control tower in Edmonson County, Kentucky. This Design/Bid/Build project involves the removal of the old hoist and necessary structural modifications to support the new hoist, which will enhance the capability for lifting service gates and bulkheads. Contractors with experience in heavy and civil engineering construction, particularly those familiar with hoist systems and structural modifications, are encouraged to bid on this opportunity. The project is expected to be completed within 365 days from the Notice to Proceed, with an estimated cost range between $500,000 and $1,000,000.
Description

                                                  Nolin River Lake Hoist Replacement Pre-Solicitation Synopsis

In accordance with

Entities
DOD
Department of Defense
DOTA
Department of the Army
NAICS
237990
Set Aside
None
Place of Performance
Mammoth Cave , Kentucky
Point of Contact
Full Name Email Phone Type
Ethan Phillips [email protected] 5023156545 primary
Attachments
  • Presolicitation+Synopsis.pdf