OLYM - HEART O HILLS LOOP B ABATEMENT and DEMOLITI
SAM.GOV
Due: May 15, 2025 at 09:00 PM UTC
In-Active Solicitation SBA Source Url

Summary

The opportunity titled "OLYM - HEART O HILLS LOOP B ABATEMENT and DEMOLITION" involves the abatement of hazardous materials, specifically asbestos and lead, and the demolition of the interior of the Heart O' the Hills Campground Comfort Station (Building 753) located in Olympic National Park, Washington. The contractor will be responsible for the complete removal of asbestos, lead, mold, and other hazardous materials, ensuring that all removed materials are disposed of properly at authorized locations outside the park. This project is a Total Small Business Set-Aside, making it an ideal opportunity for small businesses with experience in environmental remediation and demolition work. Contractors should be prepared to coordinate closely with the National Park Service and adhere to strict safety and environmental regulations throughout the project.
Description
The work of this contract consists of the abatement of asbestos and demolition of the interior rooms to the interior framing. (studs). The abatement performed will be complete removal of asbestos, lead, mold, and/or other materials and / or remediation of hazardous materials. All materials removed
Entities
IDOT
Department of the Interior
NPS
National Park Service
NAICS
562910
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Point of Contact
Full Name Email Phone Type
Chisolm, Mickey [email protected] 3605653025 primary
Attachments
  • B08_Attachment_03_Map_to_HoTH_Loops_B_.pdf
  • B08_Attachment_01_Solicitation_Provisions__terms__and_Clauses_-_HOH_Abatement_and_Demolition.pdf
  • B08_Attachment_04_Parking_site_map_HoTH_b_loop.pdf
  • B08_Attachment_06_SCA_Wage_Determination_Clallam_County_15-5545_SAM.pdf
  • B08_Attachment_08_Exp_and_PP_Form.docx
  • Sol_140P8325Q0016.pdf
  • B08_Attachment_09_Report_on_Limitations_on_Subcontracting_Form.xlsx
  • B08_Attachment_05_Asbestos_and_Lead_Survey_Report_-_Restroom_Loop_B_Rev__1.pdf
  • B08_Attachment_07_Forms_to_Return_with_Quote.docx
  • B08_Attachment_02_Revised_Statement_Of_Work.pdf