P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA
SAM.GOV
Due: June 3, 2025 at 09:00 PM UTC
In-Active Solicitation Source Url

Summary

The opportunity P-1238 involves the construction of a 10 MW Battery Energy Storage System (BESS) at the Marine Corps Air Ground Combat Center (MCAGCC) in Twentynine Palms, California. This project aims to enhance grid stability and resiliency by integrating the BESS with existing solar photovoltaic systems and the installation's microgrid. The work will include the design and construction of modular packaged units that will support clean energy charging and provide energy resilience during peak demand periods. Contractors with experience in design-build projects, particularly in energy systems and renewable energy integration, are encouraged to bid on this opportunity.
Description

This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build contract for the design and construction of a total of 10MW/40MWh (6.0MW/24MWh at cogeneration site 1 and 4.0MW/16MWh at cogeneration site 2) of Battery Energy Storage Systems (BESS) at two (2) locat

Entities
DOD
Department of Defense
DOTN
Department of the Navy
NAICS
237130
Set Aside
None
Place of Performance
Twentynine Palms , California 92277
Point of Contact
Full Name Email Phone Type
Kathryn Cranford [email protected] 6197054644 primary
Jaime Flores [email protected] 6197054873 secondary
Attachments
  • Phase+Two+Enclosure+3_P1238_Blank_OfferSchedule_Revised.xlsx
  • N6247324R5227_Amendment+0009_SF30.pdf
  • EXHIBIT+D_5227.pdf
  • WD+CA20240026-09-06-2024.pdf
  • N6247324R5227_Amendment+0008.pdf
  • AMENDMENT+0004+Opening+Discussions.pdf
  • N6247324R5227_Amendment+0006.pdf
  • EXHIBIT+A_5227.pdf
  • Phase+Two+Enclosure+4+-+P1238_RFI+Submission+Form.xlsx
  • EXHIBIT+E_P1238_Historical+Small+Business+Utilization.pdf
  • AMENDMENT+0001_P1238_24R5227_FINAL.pdf
  • EXHIBIT+F_+5227.pdf
  • RFI+RESPONSES_+N6247322R5227_02MAY24.xlsx
  • Phase+Two+Enclosure+1+-+P1238_RFP+Part+1_Revision+2_02APR2025.pdf
  • N6247324R5227+Amendment+0007.pdf
  • RFI_RESPONSES_N6247322R5227_16MAY24_FINAL.xlsx
  • AMENDMENT+0002_24R5227_FINAL.pdf
  • Phase+Two+Enclosure+1+-+P1238_RFP+Part+1_Revised+01APR25.pdf
  • Phase+Two+Enclosure+5+-+P1238_Wage+Determination+CA20250017.pdf
  • Phase+Two+Enclosure+1+-+P1238_RFP+Part+1.pdf
  • Revised+Standard+Form+%28SF%29+1442_P1238_N6247324R5227.pdf
  • Phase+Two+Enclosure+3+-+P1238_Blank_OfferSchedule.xlsx
  • EXHIBIT+E_5227.pdf
  • AMENDMENT+0005+Close+Discussions+and+Request+FRPs.pdf
  • Amendment+0003.pdf
  • EXHIBIT+B_5227.pdf
  • Phase+Two+Enclosure+1_P1238_RFP+Part+1_Revised.pdf
  • EXHIBIT+C_5227.pdf
  • P1238_RFI+Submission+Form_Responses_17APR2025.xlsx
  • RFI+FORM+N6247322R5227.xlsx
  • EXHIBIT+B_Construction+Design+Controls+System+Experience+Project+Data+Sheet.pdf
  • AMENDMENT+0002_EXHIBITS_ATTACHMENTS_24RF5227.zip
  • N6247324R5227_FINAL_22APR+24.pdf