PIP-II CDS Tunnel Warm Piping Installation
SAM.GOV
Due: June 5, 2025 at 08:00 PM UTC
In-Active Sources Sought SBA Source Url

Summary

The PIP-II CDS Tunnel Warm Piping Installation opportunity involves the installation of a warm piping system as part of the cryogenic distribution system for the Proton Improvement Plan-II at the Fermi National Accelerator Laboratory. This project is crucial for providing room temperature helium gas to the accelerator and recovering cold helium gas following pressure relief events. Contractors with experience in piping installation, particularly in cryogenic systems, and those who can comply with stringent safety and quality control standards are encouraged to bid. The work will take place in the accelerator tunnel located in Batavia, Illinois, and is set aside for small businesses under the SBA guidelines.
Entities
EDO
Department of Energy
NAICS
238220
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Illinois 60510
Point of Contact
Full Name Email Phone Type
Sandra Efstathiou [email protected] 6308405784 primary
Attachments
  • ED0036972-PIP-II+CDS+Tunnel+Warm+Piping+Installation+SOW.pdf
  • SARC_Subcontractor+Annual+RepsCerts+Rev+3.pdf
  • Bond+Bid+FL-41.pdf
  • FFDG+General+Terms+and+Conditions+for+Construction+%2801.2025%29.pdf
  • 013100_E+S+and+H+Requirements+FermiForward-.pdf
  • PUR-466_Proposal+Certifications.pdf
  • F10177204_-_CDS+WARM+PIPING+IN+LINAC+TUNNEL+Top+Level+Drawing.pdf
  • 010010_General_Requirements_ED0036972_FermiForward.pdf
  • Bond+Payment+FL-42.pdf
  • Bond+Performance+FL-40.pdf