SAM.GOVDue: June 5, 2025 at 08:00 PM UTCIn-ActiveSources SoughtSBASource Url
Summary
The PIP-II CDS Tunnel Warm Piping Installation opportunity involves the installation of a warm piping system as part of the cryogenic distribution system for the Proton Improvement Plan-II at the Fermi National Accelerator Laboratory. This project is crucial for providing room temperature helium gas to the accelerator and recovering cold helium gas following pressure relief events. Contractors with experience in piping installation, particularly in cryogenic systems, and those who can comply with stringent safety and quality control standards are encouraged to bid. The work will take place in the accelerator tunnel located in Batavia, Illinois, and is set aside for small businesses under the SBA guidelines.