Pittsburgh International Airport (PIT) Refurbish Parking Lot and Sidewalk
SAM.GOV
Due: May 21, 2025 at 09:00 PM UTC
In-Active Solicitation Source Url

Summary

The opportunity at Pittsburgh International Airport (PIT) involves the refurbishment of the parking lot and sidewalks, requiring contractors to provide materials, labor, tools, and other necessary services to complete the project. The scope of work includes removing and replacing old concrete sidewalks, asphalt sidewalks, concrete curbs, milling and resurfacing asphalt pavement, refurbishing exterior door structural facades, parking lot striping, and repairing security chainlink fences. This project is suitable for contractors with experience in construction and renovation, particularly those familiar with airport facilities and compliance with federal regulations.
Description

Scope: The Contractor shall supply materials, labor, tools, plant, supplies, equipment,
transportation, superintendence, temporary construction of every nature, and other services and
facilities necessary to complete the construction of the described works, including incidental

Entities
TDO
Department of Transportation
FAA
Federal Aviation Administration
NAICS
238990
Set Aside
None
Place of Performance
Pittsburgh , Pennsylvania 15231
Point of Contact
Full Name Email Phone Type
Rodgers Cox [email protected] primary
Attachments
  • Attachment+No.+1+-+PIT+Parking+Specs+and+Drawings+4-8-2025.pdf
  • SIR+-+697DCK-25-R-00272.pdf
  • Attachment+No.+3+-+Site+Visit+Registration+Form+-+EXAMPLE.doc
  • Attachment+No.+2+-+Davis+Bacon+Wage+Rates.pdf