Our AI platform powers the best government contractors to win more.
Be the first to know, bid, and win.
Prefabricated Timber Crossing Panels for 11 rail crossings. Prefabricated panels are required for Maintenance-of-Way personnel to replace cross-ties under the rail crossings. The cross-ties hold the track in gauge (56-1/2 inches). Panels must be fit for 100-lb RE rail placed on 10
Full Name | Phone | Type | |
---|---|---|---|
Kevin Harp | [email protected] | 5716448800 | primary |
Joy Davis | [email protected] | 3157729900 | secondary |